Materials Flow Control in Hybrid Make-to-Stock/Make-to-Order Manufacturing
详细信息    查看全文
  • 关键词:Make ; to ; Stock/ Make ; to ; Order (MTO ; MTS) ; Base ; stock ; CONWIP ; DBR ; simulation
  • 刊名:Lecture Notes in Computer Science
  • 出版年:2015
  • 出版时间:2015
  • 年:2015
  • 卷:9335
  • 期:1
  • 页码:559-568
  • 全文大小:226 KB
  • 参考文献:1.Nyhuis, P., Wiendahl, H.-P.: Fundamentals of Production Logistics: Theory, Tools and Aplications. Springer-Verlag, Heidelberg (2009)CrossRef
    2.Åhlström, P., Westbrook, R.: Implications of Mass Customisation for Operations Management. International Journal of Operations and Production Management 19(3), 262–274 (1999)CrossRef
    3.Kaminskya, P., Kayab, O.: Inventory positioning, scheduling and lead-time quotation in supply chains. International Journal of Production Economics 114(1), 276–293 (2008)CrossRef
    4.Kimball, G.: General principles of inventory control. Journal of Manufacturing and Operations Management 1(1), 119–130 (1988)
    5.Lee, Y.J., Zipkin, P.: Tandem queues with planned inventories. Operations Research 40(5), 936–947 (1992)CrossRef
    6.Spearman, M.L., Woodruff, D.L., Hopp, W.J.: CONWIP: a pull alternative to kanban. The International Journal of Production Research 28(5), 879–894 (1990)CrossRef
    7.Goldratt, E.M., Fox, R.E.: The Race. North River Press, New York (1986)
    8.Fry, T.D., Karwan, K., Steele, D.: Implementing drum-buffer-rope to control manufacturing lead time. The International Journal of Logistics Management 2(1), 12–18 (1991)CrossRef
    9.Aviv, Y., Federgruen, A.: Capacitated multi-item inventory systems with random and seasonally fluctuating demands: implications for postponement strategies. Management science 47(4), 512–531 (2001)MathSciNet CrossRef
    10.Gupta, D., Benjaafar, S.: Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis. IIE Transactions 36, 529–546 (2004)CrossRef
    11.Almehdawe, E., Elizabeth Jewke, E.: Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy. International Journal of Production Economics 144(1), 200–208 (2013)CrossRef
    12.Fernandes, N.O., Silva, C., Carmo-Silva, S.: Order release in a hybrid MTO-MTS two-stage production system. In: Pre-prints of the 18th International Working Seminar on Production Economics, Innsbruck, Austria, February 24–28, 2014
    13.Cox III, J.F., Blackstone Jr., J.H. (eds.): APICS Dictionary Alexandria. APICS, VA (2002)
    14.Henrich, P., Land, M., Gaalman, G.J.C.: Exploring applicability of the workload control concept. International Journal of Production Economics 90(2), 187–198 (2004)CrossRef
    15.Land, M.J., Gaalman, G.: The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics 56–57(1), 347–364 (1998)CrossRef
    16.Bonvik, A.M., Couch, C.E., Gershwin, S.B.: A comparison of production-line control mechanisms. International Journal of Production Research 25(3), 789–804 (1997)CrossRef
  • 作者单位:Filipa Rocha (16)
    Emanuel Silva (16)
    Ângela Lopes (16)
    Luis Dias (16)
    Guilherme Pereira (16)
    Nuno O. Fernandes (17)
    S. Carmo-Silva (16)

    16. Department of Production and Systems, University of Minho, Campus de Gualtar, 4710-057, Braga, Portugal
    17. Instituto Politécnico de Castelo Branco, Av. Empresário, 6000-767, Castelo Branco, Portugal
  • 丛书名:Computational Logistics
  • ISBN:978-3-319-24264-4
  • 刊物类别:Computer Science
  • 刊物主题:Artificial Intelligence and Robotics
    Computer Communication Networks
    Software Engineering
    Data Encryption
    Database Management
    Computation by Abstract Devices
    Algorithm Analysis and Problem Complexity
  • 出版者:Springer Berlin / Heidelberg
  • ISSN:1611-3349
文摘
Today’s company competiveness is favoured by product customisation and fast delivery. A strategy to meet this challenge is to manufacture standard items to stock for product customisation. This configures a hybrid environment of make-to-stock and make-to-order. To explore the advantages of this requires good understanding of production control. Thus, we study production under hybrid MTS-MTO, organising the system in two stages. The 1st manufactures items to inventory, which are then customised in the 2nd. We analyse how the percentage of tardy orders is affected by the inventory of items required to achieve a given fill rate. The impact of two mechanisms for releasing orders to both stages is also analysed. Results of a simulation study indicate that most of the reduction on the percentage of tardy orders is achieved by a moderate increase in the stock level of semi-finished products. Moreover the percentage of tardy orders decreases if suitable controlled release of orders is exerted.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700