Research on AOCTPN-based modeling and simulation technology of semiconductor fabrication line
详细信息    查看全文
文摘
There was a lack of modeling technology for the line fabrication of semiconductors under multi-agent-based scheduling and control status in quo. To resolve this problem, an AOCTPN modeling technology for a semiconductor fabrication line was proposed. The interior behavior of the machine agent was encapsulated and the hierarchical multi-agent-based semiconductor fabrication line model was separated into the system layer, the machine group layer, and the machine agent layer, which reduced the complexity and improved the reuse of the model. In addition, a distributed discrete event simulation platform was built to evaluate the performance of the multi-agent-based semiconductor fabrication line. An illustrative example of a 6-inch semiconductor fabrication line in Shanghai demonstrates the effectiveness of this approach .

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700