Efficiency of cyclical-and-continuous method in open pit mining
详细信息    查看全文
文摘
The article reviews in brief application of cyclical-and-continuous method in the conveyor-andtruck haulage in open pit mines. Consumption of materials and power is evaluated as a function of mined rock haulage volumes and depth of crush-and-reload station position in an open pit mine. The change in capital and operational cost to transport ore and hard overburden is studied at varied distances from a crushand- reload station in open pit to a surface receiving station. Efficiency of the conveyor-and-truck haulage using cyclical-and-continuous method is evaluated. In terms of deep and large mineral deposits, the authors substantiate positions for crush-and-reload stations in large open pit mines.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700