Construction professionals’ perceived benefits of PMIS: The effects of PMIS quality and computer self-efficacy
详细信息    查看全文
  • 作者:Hyojoo Son ; Nahyae Hwang ; Changwan Kim ; Yong Cho
  • 关键词:computer literacy ; construction professional ; DeLone and McLean IS success model (ISSM) ; project management information system (PMIS) ; structural equation model
  • 刊名:KSCE Journal of Civil Engineering
  • 出版年:2016
  • 出版时间:March 2016
  • 年:2016
  • 卷:20
  • 期:2
  • 页码:564-570
  • 全文大小:241 KB
  • 参考文献:Ali, A. S. B., Anbari, F. T., and Money, W. H. (2008). “Impact of organizational and project factors on acceptance and usage of project management software and perceived project success.” Project Management Journal, Vol. 39, No. 2, pp. 5–33, DOI: 10.​1002/​pmj.​20041 .CrossRef
    Anderson, J. C. and Gerbing, D. W. (1988). “Structural equation modeling in practice: A review and recommended two-step approach.” Psychological Bulletin, Vol. 103, No. 3, pp. 411, DOI: 10.​1037/​0033-2909.​103.​3.​411 .CrossRef
    Bandura, A. (1986). Social foundations of thought and action: A social cognitive theory, Prentice-Hall, Englewood Cliffs, NJ.
    Barclay, D., Higgins, C., and Thompson, R. (1995). “The Partial Least Squares (PLS) approach to causal modeling: Personal computer adoption and use as an illustration.” Technology Studies, Vol. 2, No. 2, pp. 285–309.
    Bhattacherjee, A. (2001). “Understanding information systems continuance:An expectation-confirmation model.” MIS Quarterly, Vol. 25, No. 3, pp. 351–370, DOI: 10.​2307/​3250921 .CrossRef
    Chatterjee, S., Chakraborty, S., Sarker, S., Sarker, S., and Lau, F. Y. (2009). “Examining the success factors for mobile work in healthcare: A deductive study.” Decision Support Systems, Vol. 46, No. 3, pp. 620–633, DOI: 10.​1016/​j.​dss.​2008.​11.​003 .CrossRef
    Chien, S. W. and Tsaur, S. M. (2007). “Investigating the success of ERP systems: Case studies in three Taiwanese high-tech industries.” Computers in Industry, Vol. 58, No. 8, pp. 783–793, DOI: 10.​1016/​j.​compind.​2007.​02.​001 .CrossRef
    Compeau, D. R. and Higgins, C. A. (1995). “Computer self-efficacy: Development of a measure and initial test.” MIS Quarterly, Vol. 19, No. 2, pp. 189–211, DOI: 10.​2307/​249688 .CrossRef
    Cronin, J. J., Brady, M. K., and Hult, G. T. M. (2000). “Assessing the effects of quality, value, and customer satisfaction on consumer behavioral intention to uses in service environments.” Journal of Retailing, Vol. 76, No. 2, pp. 193–218, DOI: 10.​1016/​S0022-4359(00)00028-2 .CrossRef
    Davis, F. (1989). “Perceived usefulness, perceived ease of use, and user acceptance.” MIS Quarterly, Vol. 13, No. 3, pp 319–340, DOI: 10.​2307/​249008 .CrossRef
    Davis, K.A. and Songer, A.D. (2009). “Resistance to IT change in the AEC industry: Are the stereotypes true?.” Journal of Construction Engineering and Management, Vol. 135, No. 12, pp. 1324–1333, DOI: 10.​1061/​(ASCE)CO.​1943-7862.​0000108 .CrossRef
    DeLone, W. H. and McLean, E. R. (1992). “Information systems success: The quest for the dependent variable.” Information Systems Research, Vol. 3, No. 1, pp. 60–95, DOI: 10.​1287/​isre.​3.​1.​60 .CrossRef
    DeLone, W. H. and McLean, E. R. (2003). “The DeLone and McLean model of information systems success: A ten-year update.” Journal of Management Information Systems, Vol. 19, No. 4, pp. 9–30.
    Etezadi-Amoli, J. and Farhoomand, A. F. (1996). “A structural model of end user computing satisfaction and user performance.” Information & Management, Vol. 30, No. 2, pp. 65–73, DOI: 10.​1016/​0378-7206(95)00052-6 .CrossRef
    Fishbein, M. and Ajzen, I. (1975). Belief, attitude, intention and behavior: An introduction to theory and research, Reading, MA: Addison-Wesley
    Fornell, C. and Larcker, D. F. (1981). “Evaluating structural equation models with unobservable variables and measurement error.” Journal of Marketing Research, Vol. 18, No. 1, pp. 39–50, DOI: 10.​2307/​3151312 .CrossRef
    Grover, V., Cheon, M. J., and Teng, J. T. (1996). “The effect of service quality and partnership on the outsourcing of information systems functions.” Journal of Management Information Systems, Vol. 12, No. 4, pp. 89–116CrossRef
    Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. C. (1998). Multivariate data analysis with readings, Prentice-Hall, Upper Saddle River, NJ.
    Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E., and Tatham, R. L. (2006). Multivariate data analysis, 6th Ed., Prentice-Hall, Upper Saddle River, NJ.
    Halawi, L. A., McCarthy, R. V., and Aronson, J. E. (2007). “An empirical investigation of knowledge management system success.” Journal of Computer Information Systems, Vol. 48, No. 2, pp. 121–135.
    Han, S. H., Chin, K. H., and Chae, M. J. (2007). “Evaluation of CITIS as a collaborative virtual organization for construction project management.” Automation in Construction, Vol. 16, No. 2, pp. 199–211, DOI: 10.​1016/​j.​autcon.​2006.​04.​002 .CrossRef
    Hewage, K. N., Ruwanpura, J. Y., and Jergeas, G. F. (2008). “IT usage in Alberta's building construction projects: Current status and challenges.” Automation in Construction, Vol. 17, No. 8, pp. 940–947, DOI: 10.​1016/​j.​autcon.​2008.​03.​002 .CrossRef
    Hu, L. T. and Bentler, P. M. (1999). “Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives.” Structural Equation Modeling: A Multidisciplinary Journal, Vol. 6, No. 1, pp. 1–55, DOI: 10.​1080/​1070551990954011​8 .CrossRef
    Igbaria, M. (1993). “User acceptance of microcomputer technology: An empirical test.” Omega, Vol. 21, No. 1, pp. 73–90, DOI: 10.​1016/​0305-0483(93)90040-R .CrossRef
    Igbaria, M. and Tan, M. (1997). “The consequences of information technology acceptance on subsequent individual performance.” Information & Management, Vol. 32, No. 3, pp. 113–121, DOI: 10.​1016/​S0378-7206(97)00006-2 .CrossRef
    Jaafari, A. and Manivong, K. (1998). “Towards a smart project management information system.” International Journal of Project Management, Vol. 16, No. 4, pp. 249–265, DOI: 10.​1016/​S0263-7863(97)00037-9 .CrossRef
    Lee, S.-K. and Yu, J.-H. (2012). “Success model of project management information system in construction.” Automation in Construction, Vol. 25, pp. 82–93, DOI: 10.​1016/​j.​autcon.​2012.​04.​015 .CrossRef
    Lin, H. F. (2007). “Measuring online learning systems success: Applying the updated DeLone and McLean model.” Cyberpsychology & Behavior, Vol. 10, No. 6, pp. 817–820, DOI: 10.​1089/​cpb.​2007.​9948 .CrossRef
    Mason, R. O. (1978). “Measuring information output: A communication systems approach.” Information & Management, Vol. 1, No. 5, pp. 219–234, DOI: 10.​1016/​0378-7206(78)90028-9 .CrossRef
    Mathieson, K. (1991). “Predicting user intentions: Comparing the technology acceptance model with the theory of planned behavior.” Information Systems Research, Vol. 2, No. 3, pp. 173–191, DOI: 10.​1287/​isre.​2.​3.​173 .CrossRef
    Nitithamyong, P. and Skibniewski, M. J. (2006). “Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint.” Journal of Construction Engineering and Management, Vol. 132, No. 1, pp. 80–87, DOI: 10.​1061/​(ASCE)0733-9364(2006)132:​1(80) .CrossRef
    Nunnally, J. C. (1978). Psychometric theory, 2nd Ed., McGraw–Hill, New York, NY.
    Padilla-Meléndez, A., Garrido-Moreno, A., and Del Aguila-Obra, A. R. (2008). “Factors affecting e-collaboration technology use among management students.” Computers & Education, Vol. 51, No. 2, pp. 609–623, DOI: 10.​1016/​j.​compedu.​2007.​06.​013 .CrossRef
    Parasuraman, A., Zeithaml, V. A., and Berry, L. L. (1985). “A conceptual model of service quality and its implications for future research.” The Journal of Marketing, Vol. 49, No. 4, pp. 41–50, DOI: 10.​2307/​1251430 .CrossRef
    Peansupap, V. and Walker, D. H. T. (2005). “Factors enabling information and communication technology diffusion and actual implementation in construction organizations.” Electronic Journal of Information Technology in Construction, Vol. 10, No. 14, pp. 193–218.
    Petter, S. and McLean, E. R. (2009). “A meta-analytic assessment of the DeLone and McLean IS success model: An examination of IS success at the individual level.” Information & Management, Vol. 46, No. 3, pp. 159–166, DOI: 10.​1016/​j.​im.​2008.​12.​006 .CrossRef
    Rai, A., Lang, S. S., and Welker, R. B. (2002). “Assessing the validity of IS success models: An empirical test and theoretical information analysis.” Information System Research, Vol. 13, No. 1, pp. 50–69, DOI: 10.​1287/​isre.​13.​1.​50.​96 .CrossRef
    Raymond, L. and Bergeron, F. (2008). “Project management information systems: An empirical study of their impact on project managers and project success.” International Journal of Project Management, Vol. 26, No. 2, pp 213–220, DOI: 10.​1016/​j.​ijproman.​2007.​06.​002 .CrossRef
    Roca, J. C., Chiu, C. M., and Martínez, F. J. (2006). “Understanding elearning continuance intention: An extension of the Technology Acceptance Model.” International Journal of Human–Computer Studies, Vol. 64, No. 8, pp. 683–696, DOI: 10.​1016/​j.​ijhcs.​2006.​01.​003 .CrossRef
    Seddon, P. and Kiew, M. Y. (1996). “A partial test and development of DeLone and McLean's model of IS success.” Australasian Journal of Information Systems, Vol. 4, No. 1, pp. 90–109.CrossRef
    Shannon, C. E. and Weaver, W. (1949). The mathematical theory of communication, University of Illinois Press, Urbana, IL.MATH
    Shaw, N. C., DeLone, W. H., and Niederman, F. (2002). “Sources of dissatisfaction in end-user support: An empirical study.” ACM SIGMIS Database, Vol. 33, No. 2, pp. 41–56, DOI: 10.​1145/​513264.​513272 .CrossRef
    Thompson, B. (2004). Exploratory and confirmatory factor analysis: Understanding concepts and applications, American Psychological Association, Washington, DC.CrossRef
    Wang, S. M. and Chuan-Chuan Lin, J. (2011). “The effect of social influence on bloggers' usage intention.” Online Information Review, Vol. 35, No. 1, pp. 50–65, DOI: 10.​1108/​1468452111111358​8 .CrossRef
    Wang, Y. and Liao, Y. (2008). “Assessing eGovernment systems success: A validation of the DeLone and McLean model of information systems success.” Government Information Quarterly, Vol. 25, No. 4, pp. 717–733, DOI: 10.​1016/​j.​giq.​2007.​06.​002 .CrossRef
  • 作者单位:Hyojoo Son (1)
    Nahyae Hwang (1)
    Changwan Kim (1)
    Yong Cho (2)

    1. Dept. of Architectural Engineering, Chung-Ang University, Seoul, Korea
    2. The School of Civil and Environmental Engineering, Georgia Institute of Technology, Atlanta, GA, 30332, USA
  • 刊物类别:Engineering
  • 刊物主题:Civil Engineering
    Industrial Pollution Prevention
    Automotive and Aerospace Engineering and Traffic
    Geotechnical Engineering
  • 出版者:Korean Society of Civil Engineers
  • ISSN:1976-3808
文摘
A Project Management Information System (PMIS) is a key Information System (IS) tool used for the successful completion of construction projects and the achievement of organizational goals. This study investigated the effects of computer self-efficacy and IS quality (information, system, and service quality) on perceived net benefits of PMIS. The study used the updated DeLone and McLean Information System Success Model (D&M ISSM) as a theoretical foundation. The proposed model was tested empirically by using survey data collected from 379 construction professionals. The empirical results suggest that construction professionals’ perceived benefits are determined by behavioral intention to use and user satisfaction, and that these are in turn influenced by computer self-efficacy and PMIS quality. Keywords computer literacy construction professional DeLone and McLean IS success model (ISSM) project management information system (PMIS) structural equation model

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700