Simultaneous optimization of repair and control-limit policy in condition-based maintenance
详细信息    查看全文
文摘
In condition-based maintenance (CBM) planning, collected information from system condition monitoring is the basis of making decision about conducting the maintenance and repair activities. Recently, ample number of studies has been conducted in CBM field especially, in control-limit policy. In control-limit policy, using proportional Hazards model and results of monitoring system condition, one can estimate hazard rate function and its condition’s transition probability matrix. Then, considering replacement costs, optimal control-limit can be determined minimizing the average cost in the long run. The presented model considers repair policy and their implementation cost, and the assumptions of repair during interval inspection is ignored. Then, a model is presented to determine the optimal control-limit and the best repair policy, in which the average total cost per unit time in the long-run, is minimized. At the end, a numerical example is illustrated.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700