Numerical investigation of operational modes of wind-electric facilities of increased power on the plains of Uzbekistan with account for vertical variability of wind velocity. Part II
参考文献:1. Tadzhiev, U.A., Zakhidov, R.A., Orlova, N.I., et al., / Geliotekhnika, 2009, no. 2, pp. 71鈥?0. 2. Anarbaev, A.I., Zakhidov, R.A., Orlova, N.I., and Tadzhiev, U.A., / Geliotekhnika, 2009, no. 1, pp. 80鈥?8 [ / Appl. Sol. En. (Engl. Transl.), 2009, no. 1, p. 55]. 3. Koridze, A.Kh., Chkhaidze, B.SH., Shalamberidze, D.G., and Saliya, K.T., Development of Wind-Power Engineering in Georgia, / Gornyi zhurnal, 2004, special issue, pp. 103鈥?06. 4. Zakhidov, R.A., Kisileva, E.I., Orlova, N.I., and Tadzhiev, U.A., / Geliotekhnika, 1995, no. 5, pp. 105鈥?13. 5. Zakhidov, R.A., Kisileva, E.I., Orlova, N.I., and Tadzhiev, U.A., / Geliotekhnika, 1996, no. 2, pp. 65鈥?5.
作者单位:U. A. Tadzhiev (1) R. A. Zakhidov (1) N. I. Orlova (1) A. I. Anarbaev (1) M. U. Tadzhiev (1)
1. Institute of Power Engineering and Automation, Academy of Sciences of the Republic of Uzbekistan, Tashkent, Uzbekistan
ISSN:1934-9424
文摘
Numerical estimates are obtained for the basic energy and time performance characteristics of eight nominal types of high power (60 to 640 kW) wind-electric facilities on the Ustyurt plateau.