Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel, Turkey
详细信息    查看全文
  • 作者:Aydin Shaterpour-Mamaghani ; Deniz Tumac…
  • 关键词:TBM ; Tunnel excavation ; Machine utilization time ; Excavation performance
  • 刊名:Bulletin of Engineering Geology and the Environment
  • 出版年:2016
  • 出版时间:February 2016
  • 年:2016
  • 卷:75
  • 期:1
  • 页码:251-262
  • 全文大小:2,787 KB
  • 参考文献:Avunduk E (2011) Performance analysis of EPB-TBM in difficult geological conditions for Kadikoy-Kartal metro project. MSc Thesis, Istanbul Technical University
    Barla G (2001) Tunnelling under squeezing rock conditions. In: Kolymbas D (ed) Euro summer school on tunnelling mechanics, Innsbruck, Oct 08–11, pp 169–268
    Barla G, Pelizza S (2000) TBM tunnelling in difficult ground conditions. In: Geo Eng 2000-An International Conference on Geotechnical & Geological Engineering, Melbourne, Australia
    Barton N, Lien R, Lunde J (1974) Engineering classification of rock masses for the design of tunnel support. Rock Mech 6(4):189–236CrossRef
    Bieniawski ZT (1989) Engineering rock mass classifications: a complete manual for engineers and geologists in mining, civil and petroleum engineering. Wiley, New York, p 251
    Bilgin N, Algan M (2012) The performance of a TBM in a squeezing ground at Uluabat, Turkey. Tunn Undergr Space Technol 32:58–65CrossRef
    Bilgin N, Balci C, Acaroglu O, Tuncdemir H, Eskikaya S, Akgul M, Algan M (1999) The performance prediction of a TBM in Tuzla-Dragos Sewerage Tunnel. World Tunnel Congress, Challenges for the 21st Century, Balkema, Rotterdam, pp 817–827
    Buhan P, Cuvillier A, Dormieux L, Maghous S (1999) Face stability of shallow circular tunnels driven under the water table: a numerical analysis. Int J Numer Anal Methods Geomech 23:79–95CrossRef
    Clark J, Chorley S (2014) The greatest challenges in TBM tunneling: experiences from the field. In: North American Tunneling Conference, pp 101–108. ISBN 9780873353984
    Deere DU, Hendron AJ, Patton FD, Cording EJ (1967) Design of surface and near surface construction in rock. In: Fairhurst C (ed) Proceedings of 8th US symposium on rock mechanics. AIME, New York, pp 237–302
    Duke SK, Arabshahi J (2007) Evaluating ground conditions ahead of a TBM using probe drill data. In: Traylor MT, Townsend JW (ed) Rapid Excavation and Tunnelling Conference. Society of Mining Engineers, pp 430–441
    Farrokh E, Rostami J (2009) Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Tunn Undergr Space Technol 24:436–446CrossRef
    Hamidi JK, Shahriar K, Rostami J (2009) Double shield TBM in challenging, difficult ground conditions-a case study from Zagros long water transfer tunnel, Iran. 2009 Rapid Excavation and Tunnelling Conference, Proceedings, pp 1321–1333
    Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli HR (2010) TBM performance analysis in Pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43:427–445CrossRef
    International Tunnelling and Underground Space Association (2003) Long traffic tunnels at great depth. ITA Working group N° 17 “Long tunnels at great depth”, ITA Lausanne
    Lee IM, Nam SW (2001) The study of seepage forces acting on the tunnel lining and tunnel face in shallow tunnels. Tunn Undergr Space Technol 16:31–40CrossRef
    Lee IM, Lee JS, Nam SW (2004) Effect of seepage force on tunnel face stability reinforced with multi-step pipe grouting. Tunn Undergr Space Technol 19:551–565CrossRef
    Myer LR, Brekke Tl, Korbin GE, Kavazanjian E, Mitchell JK (1977) Stand-up time of tunnel in squeezing ground—part I: physical model study, Report No. DOT-TST-77-59, Department of Civil Eng., University of California, Berkeley, June
    Nilsen B (2014) Characteristics of water ingress in Norwegian subsea tunnels. Rock Mech Rock Eng 47:933–945CrossRef
    Ozaslan H (2007) Final geotechnical report of second stage of Isikli Tunnel, vol 1, p 389 (In Turkish)
    Ramoni M (2010) On the feasibility of TBM drives in squeezing ground and the risk of shield jamming. PhD Thesis, ETH Zurich University
    Ramoni M, Anagnostou G (2010a) Thrust force requirements for TBMs in squeezing ground. Tunn Undergr Space Technol 25:433–455CrossRef
    Ramoni M, Anagnostou G (2010b) Tunnel boring machines under squeezing conditions. Tunn Undergr Space Technol 25:139–157CrossRef
    Ramoni M, Anagnostou G (2011a) The effect of consolidation on TBM shield loading in water-bearing squeezing ground. Rock Mech Rock Eng 44:63–83CrossRef
    Ramoni M, Anagnostou G (2011b) The interaction between shield, ground and tunnel support in TBM tunnelling through squeezing ground. Rock Mech Rock Eng 44:37–61CrossRef
    Serlev AF (2010) Assessing the impact of squeezing ground on TBM excavation. Dissertation, University of Barcelona
    Shrestha PK, Panthi KK (2014) Groundwater effect on faulted rock mass: an evaluation of ModiKhola pressure tunnel in the Nepal Himalaya. Rock Mech Rock Eng 47:1021–1035CrossRef
    Zarei HR, Uromeihy A, Sharifzadeh M (2011) Evaluation of high local groundwater inflow to a rock tunnel by characterization of geological features. Tunn Undergr Space Technol 26:364–373CrossRef
  • 作者单位:Aydin Shaterpour-Mamaghani (1)
    Deniz Tumac (1)
    Emre Avunduk (1)

    1. Mining Engineering Department, Istanbul Technical University, Maslak, Istanbul, Turkey
  • 刊物类别:Earth and Environmental Science
  • 刊物主题:Earth sciences
    Applied Geosciences
    Structural Foundations and Hydraulic Engineering
    Geoecology and Natural Processes
    Nature Conservation
  • 出版者:Springer Berlin / Heidelberg
  • ISSN:1435-9537
文摘
The performance analysis of double shield TBMs in difficult ground conditions in the Gerede tunnel is presented in this study. The strength of the encountered formations along the tunnel route varied from medium strength (sandstone, limestone) to high strength (basalt). The total length of tunnels is 31.6 km, which was excavated by three double shield TBMs having diameter of 5.57 m. Literature studies are first carried out in order to review the difficult ground conditions and their impacts on mechanized tunnelling. Later, the project, geology, and the characteristics of the TBMs are given in detail. Then the factors affecting the performance of the TBMs, machine utilization, and operational parameters (torque, thrust) are discussed in detail. In the light of these facts, the main objective of this study is to describe the possible improvement methods to reduce the effect of these difficulties on TBM performance. Keywords TBM Tunnel excavation Machine utilization time Excavation performance

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700