Risk Assessment and Estimation of TBM Penetration Rate Using RES-Based Model
详细信息    查看全文
  • 作者:Hadi Fattahi ; Ali Moradi
  • 关键词:TBM ; Rock properties ; Penetration rate ; Rock engineering systems ; Multiple regression models
  • 刊名:Geotechnical and Geological Engineering
  • 出版年:2017
  • 出版时间:February 2017
  • 年:2017
  • 卷:35
  • 期:1
  • 页码:365-376
  • 全文大小:
  • 刊物类别:Earth and Environmental Science
  • 刊物主题:Geotechnical Engineering & Applied Earth Sciences; Hydrogeology; Terrestrial Pollution; Waste Management/Waste Technology; Civil Engineering;
  • 出版者:Springer International Publishing
  • ISSN:1573-1529
  • 卷排序:35
文摘
The tunnel boring machine (TBM) penetration rate (PR) estimation is one of the crucial and complex tasks encountered frequently to excavate the mechanical tunnels. Predicting the PR is a nonlinear and multivariable complex problem and establishing relationship between rock properties and PR is not a simple task. To overcome this problem, in this paper, based on the basic concepts of a rock engineering systems (RES) approach, a model for the estimation of the PR and the risk associated is presented. The suggested model involves 6 effective parameters on PR (uniaxial compressive strength (UCS), ratio of the maximum load (PSI), average distance between planes of weakness (DPW), angle between tunnel axis and the planes of weakness (Alpha), Brazilian tensile strength (BTS) and rock fracture class (RFC)), while retaining simplicity as well. The performance of the RES model is compared with multiple regression models. The estimation abilities offered using RES and multiple regression models were presented by using field data given in open source literatures. The results indicate that the RES based model predictor with less mean square error (MSE) and higher coefficient of determination (R2) performs better than the other models (used in this study).

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700