Uncertainty analysis of an industrial system using Intuitionistic Fuzzy Set Theory
详细信息    查看全文
  • 作者:Yashi Vishwakarma ; S. P. Sharma
  • 关键词:Availability ; MTBF ; MTTR ; Vague Lambda ; Tau methodology ; Fuzzy Lambda ; Tau method
  • 刊名:International Journal of Systems Assurance Engineering and Management
  • 出版年:2016
  • 出版时间:March 2016
  • 年:2016
  • 卷:7
  • 期:1
  • 页码:73-83
  • 全文大小:696 KB
  • 参考文献:Arora N, Kumar D (1997) Availability analysis of steam and power generation systems in the thermal power plant. Microelectron Reliab 37(5):795–799CrossRef
    Atanassov KT (1986) Intuitionistic fuzzy sets. Fuzzy Sets Syst 20(1):87–96CrossRef MathSciNet MATH
    Birolini A (2004) Reliability engineering: theory and practice, 4th edn. Springer, New YorkCrossRef
    Bustince H, Burillo P (1996) Vague sets are intuitionistic fuzzy sets. Fuzzy Sets Syst 79(3):403–405CrossRef MathSciNet MATH
    Cai KY (1996) System failure engineering and fuzzy methodology an introductory overview. Fuzzy Sets Syst 83(2):113–133CrossRef
    Chang KH, Cheng CH (2009) A novel general approach to evaluating the PCBA for components with different membership function. Appl Soft Comput 9(3):1044–1056CrossRef MathSciNet
    Chen SM (1994) Fuzzy system reliability analysis using fuzzy number arithmetic operations. Fuzzy Sets Syst 64(1):31–38CrossRef
    Chen SM (2003) Analyzing fuzzy system reliability using vague set theory. Int J Appl Sci Eng 1(1):82–88
    Ebeling CE (2001) An introduction to reliability and maintainability engineering. Tata McGraw-Hill Company Ltd., New York
    Garg H (2013) Reliability analysis of repairable systems using Petri nets and vague Lambda-Tau methodology. ISA Trans 52(1):6–18CrossRef
    Garg H, Sharma SP (2013) Predicting uncertain behavior of the press unit in a paper mill using PSOBLT technique. J Intell Fuzzy Syst Appl Eng Technol 25(1):231–242MathSciNet
    Garg D, Kumar K, Singh J (2010) Decision support system of a tab manufacturing plant. J Mech Eng 41(1):71–79CrossRef
    Gau WL, Buehrer DJ (1993) Vague sets. IEEE Trans Syst Man Cybern 23(2):610–614CrossRef MATH
    Gupta P, Lal AK, Sharma RK, Singh J (2005) Numerical analysis of reliability and availability of the serial processes in butter-oil processing plant. Int J Qual Reliab Manag 22(3):303–316CrossRef
    Knezevic J, Odoom ER (2001) Reliability modelling of repairable systems using Petri nets and fuzzy Lambda-Tau methodology. Reliab Eng Syst Safe 73(1):1–17CrossRef
    Komal, Sharma SP, Kumar D (2009) Stochastic behavior analysis of the press unit in a paper mill using GABLT technique. Int J Intell Comput Cybern 2(3):574–593CrossRef MathSciNet
    Kumar A (2009) Reliability analysis of industrial system using GA and fuzzy approach. PhD thesis, Indian Institute of Technology, Roorkee
    Kumar M, Yadav SP (2012) A novel approach for analyzing fuzzy system reliability using different types of intuitionistic fuzzy failure rates of components. ISA Trans 51(2):288–297CrossRef MathSciNet
    Kumar A, Yadav SP, Kumar S (2006) Fuzzy reliability of a marine power plant using interval valued vague sets. Int J Appl Sci Eng 4(1):71–82MathSciNet
    Lio TS, Chiou SB (1997) The application of Petri nets to failure analysis. Reliab Eng Syst Safe 57(2):129–142CrossRef
    Mahapatra GS, Roy TK (2009) Reliability evaluation using triangular intuitionistic fuzzy numbers arithmetic operations. World Acad Sci Eng Technol 3(2):422–429MathSciNet
    Mon DL, Cheng CH (1994) Fuzzy system reliability analysis for components with different membership functions. Fuzzy Sets Syst 64(2):145–157CrossRef MathSciNet
    Murata T (1989) Petri nets: properties, analysis and applications. Proc IEEE 77(4):1989CrossRef
    Petri CA (1966) Communication with automata. Griffiss Air Force Base. Tech. Rep., New York, RADCTR-65-377, 1, SUPPI.1, 1966, Dissertation
    Reisig W (1985) Petri nets: an introduction. Springer, BerlinCrossRef MATH
    Ross TJ (2005) Fuzzy logic with engineering applications, 2nd edn. Wiley, New York
    Sharma SP, Garg H (2011) Behavioural analysis of urea decomposition system in a fertiliser plant. Int J Ind Syst Eng 8(3):271–297
    Sharma RK, Kumar S (2008) Performance modelling in critical engineering systems using RAM analysis. Reliab Eng Syst Safe 93(6):913–919CrossRef MathSciNet
    Singer D (1990) A fuzzy set approach to fault tree and reliability analysis. Fuzzy Sets Syst 34(2):145–155CrossRef
    Verma M, Kumar A (2013) Performance analysis of 66/11 KV substation by Petri nets and vague lambda tau methodology. Kuwait J Sci 40(1):93–107
    Verma M, Kumar A (2014) A novel general approach to evaluating the reliability of gas turbine system. Eng Appl Artif Intell 28:13–21CrossRef
    Verma M, Kumar A, Singh Y (2013) Vague reliability assessment of combustion system using Petri nets and vague lambda-tau methodology. Eng Comput Int J Comput Aided Eng Softw 30(5):665–681CrossRef
    Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338–353CrossRef MathSciNet MATH
  • 作者单位:Yashi Vishwakarma (1)
    S. P. Sharma (1)

    1. Department of Mathematics, Indian Institute of Technology Roorkee, Roorkee, 247667, Uttarakhand, India
  • 刊物类别:Engineering
  • 刊物主题:Operating Procedures and Materials Treatment
    Quality Control, Reliability, Safety and Risk
  • 出版者:Springer India
文摘
In this paper, the uncertainty in the operational behavior of an industrial system has been analysed using Intuitionistic Fuzzy Set (IFS) Theory. The performance of systems depends on various reliability parameters such as system failure rate, mean time to repair (MTTR), mean time between failures (MTBF), expected number of failures (ENOF), system reliability and availability. Therefore it is necessary for plant personnel to have relevant information about these parameters. As primary data related to failure and repair time are extracted from literature/experiments/expert opinions it may contain some uncertainty and impreciseness. To deal with the impreciseness and explore the information about the system parameters, IFS theory has been incorporated here. In this study, the behavior analysis and reliability measures of TAB Manufacturing Plant are discussed by Vague Lambda-Tau (VLT) method which is based on IFS theory and lambda-tau technique. The objective of this study is to analyse and find more information about reliability indices and to show the importance of Vague Lambda-Tau method over Fuzzy Lambda-Tau method. For this purpose, all the system parameter-values are obtained by Fuzzy Lambda-Tau method and are compared with Vague Lambda-Tau method values. The uncertainty analysis, done here will help the decision analyst to achieve better system maintenance strategy for failure-free operation of the system. Keywords Availability MTBF MTTR Vague Lambda-Tau methodology Fuzzy Lambda-Tau method