Determination of optimal location of TCSC and STATCOM for congestion management in deregulated power system
详细信息    查看全文
文摘
In deregulated power system, congestion management is a major problem due to operational constraints. Flexible AC transmission systems (FACTS) devices can be a choice to control the power flow in congested lines. This paper explores the use of two popular FACTS devices, TCSC and STATCOM for power flow control in electrical network and their capability to decongest the network. It suggests the optimal location of TCSC and STATCOM individually to relieve congestion with minimum power losses, voltage regulation and cost of the device. The proposed method has been verified on IEEE-14 bus system for its effectiveness. Simulation work is carried out in MATLAB software.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700