A test of parallel operating three-phase transformers with different transformation factrs
详细信息    查看全文
文摘
This article presents the results of testing two parallel operating three-phase power transformers with different transformation factors. The practical operation of power engineering systems often makes it necessary to split up the substation transformer capacity, which usually requires installing two parallel transformers instead of one, though with the same total power. The problem arises from this replacement of how to ensure uniform load distribution between the transformers. In the case of similarly designed transformers of equal power uniform load distribution is ensured automatically due to symmetrical parallel circuits. However, if differently designed transformers with different transformation factors are enabled in parallel, the uniformity of load distribution between them will be violated. It has been proven by testing that, with increasing total load, parallel operating transformers with very different transformation factors decrease the consumption of current by windings of the transformer with a higher transformation factor.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700