Performance of 300聽s-beam extraction in the KSTAR neutral beam injector
详细信息查看全文 | 推荐本文 |
摘要
The first neutral beam injector (NBI-1) has been developed for the Korea Superconducting Tokamak Advanced Research (KSTAR) tokamak. The first long pulse ion source (LPIS-1) has been installed in the NBI-1 for an auxiliary heating and current drive of KSTAR plasmas. The performance of 300聽s ion beam extraction in the LPIS-1 was investigated on the KSTAR NBI-1 system, prior to the neutral beam injection for long pulse operation. The ion source consists of a magnetic bucket plasma generator with multi-pole cusp fields and a set of prototype tetrode accelerators with circular-type apertures. The inner volume of the plasma generator and accelerator column in the LPIS-1 is approximately 123聽L. The nominal operation requirements for the ion source (IS) were a 100聽kV/50聽A deuterium beam and a 300聽s pulse length. The extraction of ion beams was initiated by the formation of arc plasmas in the LPIS-1, called an arc-beam extraction method. A stable ion beam extraction of the LPIS-1 was achieved with 80聽kV/27聽A and a beam perveance of 1.19聽microperv for a 300聽s pulse length. Beam power deposition along the NBI-1 has been measured using water-flow calorimetry (WFC), and the sum of the deposited power on the ion source and beamline components was about 93%of the drained acceleration power (Vacc鈥acc). The beam power deposition was compared to the calculated results of the beam transport with re-ionization (BTR) code.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700