Research on the designed emergency passive residual heat removal system during the station blackout scenario for CPR1000
详细信息查看全文 | 推荐本文 |
摘要
The concept of passive safety is put forward to improve the safety and reliability of the nuclear power plant. The secondary emergency passive residual heat removal system (EPRHRS) is an innovative design for China Pressurized Reactor (CPR1000), which can remove the core residual heat effectively and improve the inherent safety by passive methods when the station blackout (SBO) occurs. In this work, the EPRHRS, which is connected to the steam generator (SG) and consists of a heat exchanger (HX), a water tank and corresponding pipes and valves, was designed for CPR1000. The primary loop and EPRHRS were modeled using RELAP5/MOD3.4 to investigate the residual heat removal capability of the EPRHRS and the transient characteristics of the primary loop system in the event of the SBO accident. In addition, sensitivity studies were also performed to investigate effects of the main parameters of the EPRHRS on the transient behavior of the primary loop and the EPRHRS. The effect of isolation valve opening time on the primary loop and the EPRHRS was also studied in the paper. The results of the study indicate that the optimized HX area is 200 m2 when the EPRHRS water tank height is 10 m and the optimized isolation valve opening time is 30 s. The EPRHRS can remove the core decay heat from the primary loop effectively through the stable natural circulation established in the primary loop and the EPRHRS loop based on the calculation results. Therefore, it illustrates that the EPRHRS designed in the paper is effective and meaningful to CPR1000.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700