Allocation of long-term financial transmission rights for transmission expansion
详细信息查看全文 | 推荐本文 |
摘要
Long-term financial transmission rights (FTRs) could be used to create incentives for small-scale transmission investments. However, these new investments may cause negative externalities on existing FTRs. Therefore the system operator needs a protocol for awarding incremental FTRs for new transmission capacity that maximize investors’ preferences while simultaneously accounting for under-allocation of the existing network capacity by existing FTRs. To preserve revenue adequacy, the system operator calculates a minimum amount of currently unallocated FTRs (or proxy FTRs) that satisfies the power flow constraints in the existing network. The challenge is to define the proxy awards. Hogan proposes to define them as the best use of the current network along the same direction as the incremental FTR awards. This includes allowing positive or negative incremental FTR awards. In this paper we present an implementation through bi-level programming of Hogan’s proposal for allocation of long-term FTRs and apply it to a radial line and one of Hogan’s examples. Our results show that the simultaneous feasibility of the transmission investment depends on factors such as investor and preset proxy preferences, existing FTRs, and transmission capacity in both the existing network and all proposed expansions of it.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700