Overview of the JET neutral beam enhancement project
详细信息查看全文 | 推荐本文 |
摘要
The JET neutral beam (NB) heating system is being upgraded as a part of the ongoing JET Enhancement Programme. This is one of the largest upgrades of the JET machine carried out within the EFDA-JET framework. The main goals of the project are to increase the NB power delivered to JET plasma, to increase the beam pulse duration and to improve the availability and reliability of the JET NB system. The upgrade of the system is being carried out through the modification of the two existing neutral injector boxes (NIBs), each equipped with up to eight positive ion neutral injectors (PINIs). Significant changes of the JET NB system will be carried out within the next few years and will include modification of all PINIs, modification or replacement of various beamline components and corresponding instrumentation, procurement and installation of new high voltage power supply (HVPS) units and corresponding control systems and refurbishment of the 36 kV power distribution. Various physics, engineering and planning issues related to this project, as well as the current status of the project are discussed in detail. Particular attention is given to the results of a PINI prototype test, which are of crucial importance for the successful completion of the entire enhancement programme. Upon the completion of the project in 2009/2010, JET NB system should be capable of delivering more than 34 MW of deuterium beam power into the JET plasma for a duration of up to 20 s with improved reliability. This will significantly enhance overall capabilities of the JET machine in support of ITER development.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700