Scenario based robust line balancing: Computational complexity
详细信息查看全文 | 推荐本文 |
摘要
This paper studies the following line balancing problem with uncertain operation execution times. Operations on the same product have to be assigned to the stations of a transfer line. The product moves along the stations in the same direction, and operations assigned to the same station are executed sequentially. Exclusion, inclusion and precedence relations are given on the set of operations. Operation execution times are uncertain in the sense that their set belongs to a given set of scenarios. The objective is to minimize the line cycle time, which is equal to the maximum total execution time of operations of the same station, for the worst scenario. An approach to reducing the scenario set is described. Several special cases of the problem are proved NP-hard and strongly NP-hard. Enumerative dynamic programming algorithms and problem-specific polynomial time algorithms are suggested for some cases.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700