The developed control strategy implements an hierarchical cascade controller where inner loops are performed by local PLC (Programmable Logic Controller), and the outer loop is managed by a centralized SCADA system, which interacts with the entire local PLC network.
In this paper a predictive controller is implemented above the centralized SCADA platform. Tests applied to the control of temperature and luminosity in huge-area rooms are presented. The developed predictive controller optimizes the satisfaction of user explicit preferences coming from several distributed user-interfaces, subjected to the overall constraints of energy waste minimization.
In order to run the predictive controller with the SCADA platform a communication channel was developed to allow communication between the SCADA system and the Matlab application where the predictive controller runs.