Discussion of 鈥淩eserve constrained multi-area economic dispatch employing differential evolution with time-varying mutation鈥?by Manisha Sharma et al. 鈥淚nternational Journal of Electrical Power and Energy Systems鈥? 33 March (2011) 753-766
详细信息查看全文 | 推荐本文 |
摘要
This short communication presents a discussion of 鈥淩eserve constrained multi-area economic dispatch employing differential evolution with time-varying mutation鈥?by Manisha Sharma et al. 鈥淚nternational Journal of Electrical Power and Energy Systems鈥? 33 March (2011) 753-766. The discussed paper presented a multi-area economic dispatch solution for a large 40-unit system having complexities like valve point loading effects, ramp rate constraints, prohibited operating zones and transmission constraints for a large 40-unit system. Multi-area economic dispatch for such a large and complex system was not reported before in available literature. However in the reported results one unit is violating the constraints. In this communication, corrected results with lesser costs than reported in the discussed paper are presented.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700