Sequence-dependent group scheduling problem on unrelated-parallel machines
详细信息查看全文 | 推荐本文 |
摘要
In this research we address a sequence-dependent group scheduling problem on a set of unrelated-parallel machines where the run time of each job differs on different machines. To benefit both producer and customers we attempt to minimize a linear combination of total weighted completion time and total weighted tardiness. Since the problem is shown to be NP-hard, meta-heuristic algorithms based on tabu search are developed to find the optimal/near optimal solution. For some small size yet complex problems, the results from these algorithms are compared to the optimal solutions found by CPLEX. The result obtained in all of these problems is that the tabu search algorithms could find solutions at least as good as CPLEX but in drastically shorter computational time, thus signifying the high degree of efficiency and efficacy attained by the former.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700