Hisarna Pilot Plant Project
详细信息    查看全文 | 下载全文 | 推荐本文 |
  • 作者:K. MeijerC. GuentherR. J. Dry
  • 会议时间:2011-10-26
  • 作者单位:K. Meijer(Tata Steel, Netherlands)C. Guenther(Saarstahl AG, Volklingen, Germany)R. J. Dry(HIsmelt Corp, Kwinana,Australia)
  • 母体文献:第八届(2011)中国钢铁年会论文集
  • 会议名称:第八届(2011)中国钢铁年会
  • 会议地点:北京
  • 主办单位:中国金属学会
  • 语种:chi
  • 分类号:O4;TG1
摘要
HIsarnaTM represents a new phase in the global direct smelting development cycle. It is, in essence, a merger between Tata Steel-developed smelt cyclone technology and HIsmeltTM (Rio Tinto)-developed bath smelting technology. A pilot plant at Ijmuiden, Netherlands with a nominal capacity of 60,000 t/a is nearing completion and is due to start shortly. The catalyst that brought these technologies together and made the pilot plant project possible is ULCOS. The key driver from this perspective is efficient, cost-effective carbon dioxide collection for potential geological storage. Hisarna’s inherently simple, once-through gas flow path provides an easy carbon dioxide collection option without the need for a carbon dioxide scrubber. Other potential benefits include an ability to use thermal (steam) coals rather than metallurgical coals, plus ability to use lower grade iron ore types. It is expected that high phosphorous ores will be tolerated in much the same way as in Hismelt (with around 90% phosphorous rejection to slag). There is also potential for direct utilisation of titano-magnetite ore types, which could open a vast new and lower-cost paradigm in iron ore supply. Hisarna has a long way to go to reach commercial maturity, but it has the economic imperatives and technical pedigree to successfully navigate the development path. Patience and in-principle support are sought from the ultimate beneficiary of success - the international steel industry.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700