DC Interference Testing and Mitigation of New Electrically Isolated Pipelines Installed within Congested Existing Pipeline Network
详细信息    查看全文 | 下载全文 | 推荐本文 |
摘要
Congested existing buried piping or pipeline networks "within" or "close to" old plant facilities such as, gathering centers, booster stations, pipeline manifolds, etc.are normally electrically continuous to each other and are protected by common impressed current cathodic protection (CP) systems.However, new Pipeline/piping sections installed at such congested network are sometimes required to be electrically isolated from existing pipelines and are provided with separate impressed current CP systems.This paper discusses, methods implemented in design, installation, testing and commissioning of CP system of electrically isolated new pipeline sections, with special emphasis on DC stray current interference due to existing anode ground beds and existing pipelines crossing/parallelism.Case studies are included, with discussions on results of interference testing, interference mitigation, post interference mitigation surveys and protective potential surveys.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700