都香高速金沙江大桥总体设计
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Overall Design of Jinsha River Bridge on Duyun-Shangri-La Expressway
  • 作者:张合清 ; 刘孝军
  • 英文作者:ZHANG He-qing;LIU Xiao-jun;China Highway Engineering Consultants Corporation;CITIC General Institute of Architectural Design and Research Co.,Ltd.;
  • 关键词:独塔斜拉桥 ; 高速公路桥 ; 钢-混混合梁 ; 分离式双边箱PK钢箱梁 ; 钻石形桥塔 ; 斜拉索 ; 结构设计
  • 英文关键词:single-pylon cable-stayed bridge;;highway bridge;;steel-concrete hybrid girder;;PK steel box girder with separated double edge boxes;;diamond-shaped pylon;;stay cable;;structure design
  • 中文刊名:QLJS
  • 英文刊名:Bridge Construction
  • 机构:中国公路工程咨询集团有限公司;中信建筑设计研究总院有限公司;
  • 出版日期:2019-06-28
  • 出版单位:桥梁建设
  • 年:2019
  • 期:v.49;No.256
  • 语种:中文;
  • 页:QLJS201903016
  • 页数:5
  • CN:03
  • ISSN:42-1191/U
  • 分类号:89-93
摘要
都香高速金沙江大桥主桥采用跨径布置为(340+72+48+32)m的独塔斜拉桥。主梁采用钢-混混合梁,主跨为分离式双边箱的PK钢箱梁,边跨为整体式混凝土箱梁,钢-混结合面位于主跨距桥塔中心线12.4m处。桥塔采用钻石形混凝土结构,总高197.6m,其下布置整体式承台,钻孔灌注桩群桩基础。斜拉索按空间扇形双索面布置,每个空间索面设20对斜拉索,斜拉索采用1 770MPa高强度低松弛平行钢丝束。塔上索距为2.0~4.0m;梁上索距在钢箱梁段为16m,在混凝土箱梁段为8m、4.5m两种。塔端采用预应力锚固,梁端采用钢锚箱锚固。该桥桥塔采用爬模法施工,钢梁采用悬臂拼装法施工,混凝土箱梁采用支架现浇施工。
        The main bridge of the Jinsha River Bridge on Duyun-Shangri-La Expressway is designed as a (340+72+48+32) m single-pylon cable-stayed bridge.The main girder is composed of steel-concrete hybrid girder,the main span of which consists of PK steel box girder with separated double edge boxes,and the side span of which consists of integral concrete box girder.The steelconcrete interface is located at the main span,12.4 mfrom the center line of the bridge pylon.A diamond-shaped concrete structure is adopted in the bridge pylon with a height of 197.6 m.An integral pile cap and a pile group foundation of bored piles are set under the pylon.The stay cables are arranged in spatial fan shape in double cable planes.Each spatial cable plane includes 20 pairs of stay cables.The stay cables are made of 1 770 MPa high-strength and low-relaxation parallel steel wire strands.The cable distances on pylon are 2.0 mto 4.0 m,while the cable distances on girder are 16 min the steel box girder sections and 8 mor 4.5 min the concrete box girder sections.The stay cables are anchored by prestressing at the pylon,while they are anchored by steel anchor boxes at the girder.In the process of construction,the methods of climbing formwork,cantilevered assembling,and support cast-in-place building are employed for constructing the pylon,the steel girder,and the concrete box girder,respectively.
引文
[1]中国公路工程咨询集团有限公司.G7611都匀至香格里拉高速公路守望(滇黔界)至红山(滇川界)段金沙江大桥两阶段施工图设计[R].北京:2018.(China Highway Engineering Consulting Corporation.Two-Stage Construction Drawing Design of Jinsha River Bridge between Shouwang(Yunnan-Guizhou)and Hongshan(Yunnan-Sichuan)in G7611Highway from Duyun to Shangri-La City[R].Beijing:2018.in Chinese)
    [2]重庆西科水运工程咨询中心.国家高速公路网G7611都匀至香格里拉高速公路守望(滇黔界)-红山(滇川界)段金沙江特大桥航道通航条件影响评价报告[R].重庆:2018.(Chongqing Southwest Hydraulic Engineering Consulting Center.Impact Assessment Report on Navigation Condition of Waterway of Jinsha River Bridge between Shouwang(Yunnan-Guizhou)and Hongshan(Yunnan-Sichuan)in G7611 National Highway from Duyun to Shangri-La City[R].Chongqing:2018.in Chinese)
    [3]徐荣鹏.独塔叠合梁斜拉桥收缩徐变效应分析[J].公路交通技术,2019,35(1):51-58.(XU Rong-peng.Analysis of Shrinkage and Creep Effect on Single Pylon Cable Stayed Bridge[J].Technology of Highway and Transport,2019,35(1):51-58.in Chinese)
    [4]谢均胜.独塔双索面斜拉桥设计[J].北方交通,2018(2):17-20.(XIE Jun-sheng.Brief Discussion on Design of SingleTower Double Cable Plane Stayed Bridge[J].Northern Transportation,2018(2):17-20.in Chinese)
    [5]燕斌.基础隔震独塔斜拉桥抗震性能研究[J].桥梁建设,2018,48(2):25-30.(YAN Bin.Study of Seismic Performance of Single Pylon Cable-Stayed Bridges with Base Isolation Design[J].Bridge Construction,2018,48(2):25-30.in Chinese)
    [6]颜鹏飞,严松.独塔斜拉桥结构稳定性分析[J].交通科技,2019(1):39-42.(YAN Peng-fei,YAN Song.Structural Stability A-nalysis of a Single Tower Cable-Stayed Bridge[J].Transportation Science&Technology,2019(1):39-42.in Chinese)
    [7]全伟,张雷,王砺文.高烈度震区独塔斜拉桥减震优化设计[J].铁道标准设计,2015,59(10):68-72.(QUAN Wei,ZHANG Lei,WANG Li-wen.Optimized Damping Design of Single Pylon Cable-Stayed Bridge in High Intensity Seismic Region[J].Railway Standard Design,2015,59(10):68-72.in Chinese)
    [8]刘志明,陈强.宁波杭州湾大道跨十塘横江桥设计[J].世界桥梁,2013,41(4):1-4.(LIU Zhi-ming,CHEN Qiang.Design of Shitang Hengjiang River Bridge on Hangzhou Bay Road in Ningbo[J].World Bridges,2013,41(4):1-4.in Chinese)
    [9]陈名欢.新建郑万客运专线铁路独塔斜拉桥设计关键技术研究[J].铁道标准设计,2018,62(6):45-51.(CHEN Ming-huan.Key Technology Research on Design of Railway Single Pylon Cable-Stayed Bridge on Zhengzhou-Wanzhou Dedicated Passenger Line[J].Railway Standard Design,2018,62(6):45-51.in Chinese)
    [10]方圆,席进.地震作用下独塔斜拉桥抗震体系优化[J].公路,2015(5):56-60.(FANG Yuan,XI Jin.Optimization of Earthquake Resistance System for Single Tower Cable-Stayed Bridge[J].Highway,2015(5):56-60.in Chinese)

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700