摘要
大柳塔活鸡兔井1-2煤采用分层开采的方法,但在上分层开采过程中没有铺设人工假顶,导致下分层开采时巷道布置困难。针对此问题,采用综合比较法最终选定外错式布置巷道。通过理论计算及数值模拟的方法得出上、下分层巷道合理的外错距应为4.2 m,据此结果布置下分层平巷。同时开采实践显示开采期间矿山压力不明显,无巷道变形现象,外错式布置方式比较合理。
Huojitu well in Daliuta colliery decided to use slice mining to mine 1-2coal seam, but workers did not manufacture artificial roof in upper slice coal mining, resulting in the difficulties of roadway layout. In this sense, the mine determined to utilize outward staggered arrangement through the comparison of internal outward and vertical roadway layout. Then by theoretical consideration and numerical simulation, the mine determine the upper and lower roadway outward distance is 4.2 m. And the mining practice shows that ground pressure is low without distortion of roadway.
引文
[1]谭云亮.矿山压力与岩层控制[M].北京:煤炭工业出版社,2008.
[2]刘金海,姜福兴,王乃国,等.深井特厚煤层综放工作面区段煤柱合理宽度研究[J].岩石力学与工程学报,2012,31(5):921-927.
[3]刘宗柱.近距离煤层群下煤层回采巷道布置及围岩控制技术研究[D].徐州:中国矿业大学,2014.
[4]张春雷,张勇.近距离煤层同时开采巷道布置优化研究[J].煤炭科学技术,2014,42(10):53-56,78.
[5]潘国平,贾帅.近距离煤层联合开采下层煤回采巷道合理布置[J].煤炭科学技术,2013,41(S1):11-13.
[6]张学斌.近距离煤层群采动后底板应力分布及回采巷道布置方式研究[D].青岛:山东科技大学,2009.