池州长江公路大桥桥塔集聚锚钢横梁施工关键技术
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Key Construction Techniques for Steel Pylon Cross Beams for Clustered Anchor of Stay Cables for Chizhou Changjiang River Highway Bridge
  • 作者:王海伟 ; 夏江南
  • 英文作者:WANG Hai-wei;XIA Jiang-nan;Road & Bridge South China Engineering Co.,Ltd.;
  • 关键词:斜拉桥 ; 集聚锚 ; 钢横梁 ; 动臂吊 ; 型钢桁架 ; 型钢牛腿 ; 调位系统 ; 施工技术
  • 英文关键词:cable-stayed bridge;;clustered anchor;;steel cross beam;;jib crane;;section steel truss;;section steel brackets;;location tuning system;;construction technique
  • 中文刊名:GWQL
  • 英文刊名:World Bridges
  • 机构:中交路桥华南工程有限公司;
  • 出版日期:2019-03-28
  • 出版单位:世界桥梁
  • 年:2019
  • 期:v.47;No.198
  • 语种:中文;
  • 页:GWQL201902010
  • 页数:6
  • CN:02
  • ISSN:42-1681/U
  • 分类号:47-52
摘要
池州长江公路大桥跨江主桥为(3×48+96+828+280+100)m不对称混合梁双塔斜拉桥,桥塔采用花瓶型钢筋混凝土结构,上塔柱设置6道箱形结构钢横梁。斜拉索采用新型集聚方式锚固在钢横梁中,单个集聚锚钢横梁划分4个块段进行制作和安装,单块最大吊重约75.8t,安装高度为150~230m。采用大型动臂塔吊先安装中间2个块体,再依次安装边端2个块体。集聚锚钢横梁块体落位在塔柱内侧型钢牛腿支撑的桁架式承重结构上,采用三向调位系统进行精确就位形成整体。承重型钢桁架和型钢牛腿采取工厂化加工制作、型式检验、现场标准化组装等措施,确保了结构安全。
        The main river-crossing bridge of Chizhou Changjiang River Highway Bridge is an asymmetrical hybrid girder cable-stayed bridge with spans of 3×48 m,96 m,828 m,280 m,and100 m.The bridge has two pylons,which are vase-shaped reinforced concrete structures,and a number of 6 box-shaped steel cross beams are installed in the upper pylon columns.The stay cables are clustered to anchor to the steel cross beams.A single steel cross beam is divided into four blocks to manufacture and install,the maximum lifting weight of each single block is about 75.8 t,and installed at the height of from 150 to 230 m.The large-scale luffing jib tower crane was used to lift and install the steel cross beams,from the central 2 blocks towards each of the 2 side blocks.The blocks of steel cross beams were lowered to the truss-type bearing structures supported by the section steel brackets installed on the inner side of the pylon columns.The blocks were accurately positioned and assembled to form an integral structure by using the three-dimensional location tuning system.A series of measures were taken to ensure the safety of the steel cross beam installation,including the factory-manufacturing of the load-bearing steel trusses and section steel brackets,type inspection and in-situ standardized assembly.
引文
[1]杨灿文,张强,石建华.池州长江公路大桥主通航孔桥设计[J].桥梁建设,2016,46(4):92-96.
    [2]文坡,张强,石建华.池州长江公路大桥主桥桥塔上横梁锚固结构设计[J].桥梁建设,2017,47(2):83-88.
    [3]王军.榕江大桥桥塔钢锚室设计与施工关键技术[J].世界桥梁,2018,46(3):27-30.
    [4]JTG D64-2015,公路钢结构桥梁设计规范[S].
    [5]GB/T 699-2015,优质碳素结构钢[S].
    [6]刘健.芜湖长江公铁大桥钢锚梁及钢牛腿制造精度控制[J].交通科技,2017(4):74-76.
    [7]胡风明,董耀文,杨彬.乐清湾大桥钻石形索塔施工塔吊选型及布置方案研究[J].公路,2016(10):103-107.
    [8]殷扬,郁犁.苏通大桥MD3600塔吊抗风安全性评估研究[J].世界桥梁,2008(2):35-38.
    [9]刘康,邢惟东,曾远,等.重庆红岩村嘉陵江大桥索塔钢锚箱安装测量定位控制技术[J].世界桥梁,2018,46(4):36-41.