摘要
以实际隧道工程为背景,对其高压富水岩溶地层施工制定了详细的施工方案,并对其施工控制要点如二次衬砌、超前支护等施工控制要点展开了具体的探讨,确保了隧道施工的顺利进行。
Based on the actual tunnel engineering, the detailed construction scheme of the high-pressure water-rich karst stratum construction is made, and the key points of the construction control, such as secondary lining and advanced support are discussed in detail to ensure the smooth construction of the tunnel.
引文
[1]邢绍川.富水岩溶隧道施工技术研究[D].北京:北京交通大学,2014.
[2]段会岳.高压富水岩溶地层隧道施工技术[J].建筑技术开发,2016(3):67.
[3]卢捷.高压富水岩溶地层隧道施工技术分析[J].交通世界,2017(14):90-91.