基于MIKE的杜家台洪道行洪能力研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Flood Discharge Capacity of Dujiatai Flood Diversion Channel Based on MIKE
  • 作者:何典灿 ; 周建中 ; 江炎生 ; 翁朝晖 ; 彭甜
  • 英文作者:HE Dian-can;ZHOU Jian-zhong;JIANG Yan-sheng;WENG Zhao-hui;PENG Tian;School of Hydropower & Information Engineering,Huazhong University of Science and Technology;Flood Control and Drought Relief Office of Hubei Province;Design Department for Flood Control,Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute;
  • 关键词:杜家台分蓄洪区 ; 行洪能力 ; MIKE ; 洪水演进 ; 数值模拟
  • 英文关键词:Dujiatai diversion and storage project;;flood discharge capacity;;MIKE;;flood propagation;;numerical simulation
  • 中文刊名:CJKB
  • 英文刊名:Journal of Yangtze River Scientific Research Institute
  • 机构:华中科技大学水电与数字化工程学院;湖北省防汛抗旱办公室;湖北省水利水电规划勘测设计院防洪设计处;
  • 出版日期:2016-09-29 08:51
  • 出版单位:长江科学院院报
  • 年:2017
  • 期:v.34;No.227
  • 基金:国家自然科学基金重点项目(91547208,51239004);国家自然科学基金面上项目(51579107)
  • 语种:中文;
  • 页:CJKB201709013
  • 页数:6
  • CN:09
  • ISSN:42-1171/TV
  • 分类号:56-60+82
摘要
2005年、2011年杜家台2次洪道分流以最小损失换取最大安全,为汉江中小洪水调度模式提供新思路。针对杜家台工程现状特点,充分考虑现行预案调度运用,基于MIKE水动力软件,构建汉江、杜家台洪道及围垸的一、二维耦合数值模型,实现杜家台洪道行洪能力及效果分析。模拟结果表明,按照预案调度现状洪道分流,除新农垸及张沉湖垸堤顶高程不足外,可在汉口水位较高时基本实现安全行洪2 000~2 500 m~3/s;汉江遭遇设计洪水时,优先利用洪道夹水入江的防洪效益十分显著。研究成果为完善杜家台分洪工程洪道运用模式及类似工程调度提供依据。
        The use of Dujiatai flood diversion channel in 2005 and 2011 provided a new idea of regulation mode for medium and small floods in Hanjiang River,achieving the goal of minimum loss and maximum safety. According to the present condition and regulation schemes of Dujiatai diversion area,a 1D and 2D coupled numerical model was established on the basis of hydrodynamic software MIKE to simulate the flood discharge ability and effects of Dujiatai flood diversion channel. Hanjiang River,Dujiatai flood diversion channel and inner embankments are taken into account in the model.Results show that the safe discharge of Dujiatai flood channel is about 2000-2500 m~3/s,except for the insufficient embankment top elevations at Xinnongyuan and Zhangchen Lake when Hankou station is at a higher water level. In addition,when Hanjiang River suffers from design flood,operation of Dujiatai flood diversion channel in priortity could obviously reduce flood losses. In conclusion,the results offer reference for improving regulation modes of Dujiatai diversion project and other similar projects.
引文
[1]翁朝晖,王煌,张晚祺.杜家台分蓄洪区的必要性及洪道行洪能力研究[J].人民长江,2006,37(4):50-52.
    [2]覃莲超,余明辉,李二明,等.杜家台分蓄洪区洪水调度数值模拟及分洪效果研究[J].泥沙研究,2011,(4):38-43.
    [3]张军,皮凌华,向德明,等.杜家台分蓄洪区运用预案研究[J].中国防汛抗旱,2012,22(3):44-45.
    [4]肖立国,王卫民,陶圣红,等.汉江杜家台分洪工程行洪道分流效果分析[J].中国水利,2012,(9):48-50.
    [5]湖北省防汛抗旱指挥部汉江防汛办公室.杜家台分蓄洪区运用预案[R].武汉:湖北省防汛抗旱指挥部汉江防汛办公室,2014.
    [6]湖北省水利水电勘测设计院.杜家台分蓄洪区洪道应急整治工程实施方案[R].武汉:湖北省水利水电勘测设计院,2012.
    [7]廖威林,周小文,何勇彬.城市地区水库溃坝洪水演进模拟[J].长江科学院院报,2014,31(10):98-103.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号