基于电网考核细则的火电机组一次调频优化
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Optimization of Primary Frequency Compensation for Thermal Units Based on Power Grid Examination Rules
  • 作者:殷建华 ; 于海存 ; 霍红岩 ; 郭玉光 ; 时炜
  • 英文作者:YIN Jianhua;YU Haicun;HUO Hongyan;GUO Yuguang;SHI Wei;Inner Mongolia Power Research Institute;Wulate Thermal Power Plant;Wuhai Thermal Power Plant;
  • 关键词:火电机组 ; 一次调频 ; 协调控制系统 ; DEH系统 ; 响应时间 ; 频率偏差 ; 流量指令
  • 英文关键词:thermal power unit;;primary frequency compensation;;coordinated control system;;DEH system;;response time;;frequency deviation;;flow instruction
  • 中文刊名:NMDJ
  • 英文刊名:Inner Mongolia Electric Power
  • 机构:内蒙古电力科学研究院;北方联合电力有限责任公司乌拉特发电厂;北方联合电力有限责任公司乌海热电厂;
  • 出版日期:2019-06-17 09:30
  • 出版单位:内蒙古电力技术
  • 年:2019
  • 期:v.37;No.191
  • 基金:内蒙古电力科学研究院2018年自筹科技计划项目(2018-ZC-04)
  • 语种:中文;
  • 页:NMDJ201903021
  • 页数:7
  • CN:03
  • ISSN:15-1200/TM
  • 分类号:83-88+92
摘要
针对近年蒙西电网火电机组一次调频试验中存在个别机组由于组态逻辑设计不正确、机组运行方式不合理而导致的一次调频响应时间和飞升时间超标、组态方案页执行周期过长导致响应时间超标、压力拉回回路导致动作值不达标、阀门流量非线性导致指标不达标等问题,结合国家电网华北电力调控分中心《华北电网并网机组一次调频性能评价指标及计算方法(试行)》新增加的15 s和30 s出力响应指数和电量贡献指数的评价指标,提出了组态逻辑设计的改进方法和优化机组运行方式的建议。
        This paper analyzes the problems existing in primary frequency modulation test of Western Inner Mongolia power grid in resent years. Such as, the problem of overstandard primary frequency modulation response time and flying time due to incorrect configuration logic design; the problem of excessive response time caused by too long execution cycle of configuration scheme page; the problem of substandard index caused by nonlinear flow rate of valve; the problem of action value is not up to standard caused by pressure pull back loop. At the same time, combine with the 15 s and 30 s output response index and electricity contribution index in Evaluation index and calculation method of Pirmary Frequency Modulation performance of Grid-Connected Units in North China Power Grid(trial) issued by the North China Electric Power Control Subcenter of the State Grid for analysis, and puts forward the improvement method of configuration logic design and the suggestion of optimizing the operation mode of the unit.
引文
[1]全国电力监管标准化技术委员会.发电机组并网安全条件及评价:GB/T 28566—2012[S].北京:中国标准出版社,2012.
    [2]杨振勇,李卫华,骆意.火力发电机组一次调频问题研究[J].华北电力技术,2008(1):16-20.
    [3]黄卫剑,张曦,陈世和,等.提高火电机组一次调频响应速度[J].中国电力,2011(1):73-77.
    [4]汤可怡,杨建明,蔡喜冬.大型机组一次调频性能优化方法[J].发电设备,2016(6):374-377.
    [5]国家电网华北电力调控分中心.华北电网并网机组一次调频性能评价指标及计算方法(试行)[Z].北京:国家电网华北电力调控分中心,2017.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700