摘要
文章结合贵州省江口县至都格高速公路瓮安县至开阳段项目开州湖特大桥介绍了悬索桥的风险评估过程,提出了锚锭开挖施工的风险估测体系,总结了悬索桥的施工重难点,并提出相应的处置措施,为悬索桥的建设提供参考。
This paper introduces the risk assessment process of suspension bridges based on the Kaizhouhu super bridge of the Jiangkou-Duge Expressway in Guizhou Province, and proposes a risk estimation system for anchoring and excavation construction, summing up the construction difficulties of the suspension bridge. And puts forward corresponding disposal measures to provide reference for the construction of suspension bridges.
引文
[1]高艳斌.山区特大悬索桥施工风险分析[J].建材技术与应用,2018(6):23-24,27.
[2]丛霄,贾丽君,肖汝诚.大跨径悬索桥施工阶段风险评估[J].山东交通学院学报,2016(1):47-52.
[3]曾勇,向中富,于福,等.大跨度悬索桥钢加劲梁典型病害及维修策略[J].重庆交通大学学报(自然科学版),2012(S1):700-703,709.
[4]嵇正永.大跨度悬索桥施工风险评估与防范[J].中国高新技术企业,2009(21):132-133.