摘要
结合工程实例,对该桥梁连续箱梁采用菱形挂篮悬臂浇筑施工方法对其进行施工,对其施工工艺流程进行了总结,对悬浇段施工中的菱形挂篮施工作业流程、钢筋及预应力管道施工、混凝土施工、预应力施工、孔道压浆与封锚等进行了分析,从而更好的提高连续箱梁挂篮悬臂浇筑的施工质量。
Combined with engineering example,for the continuous box girder bridge with diamond hanging basket cantilever construction method of construction,the construction process are summarized,diamond hanging basket construction of suspension pouring construction process,reinforced and prestressed concrete pipe construction, concrete construction,prestressed construction,tunnel grouting and sealing anchor is analyzed,such as to better improve the cantilever construction of continuous box girder construction quality.
引文
[1]尚清喜.关于秦沈客运专线箱形梁施工的思考[J].铁道建筑技术,2001(4):26–28.
[2]韩西岭,张振伟,樊庆竹.连续梁桥现浇箱梁支架施工技术[J].黑龙江交通科技,2011(10):206,208.
[3]胡正刚.满堂支架在现浇箱梁施工中的承载分析[J].科技信息,2009(3):682–683.
[4]李飞龙.桥梁工程连续箱梁挂篮悬臂浇筑施工技术探讨[J].城市建设理论研究(电子版),2016(9):4074.
[5]吴文辉.某连续箱梁桥悬臂挂篮浇筑施工工艺与施工监控研究[J].黑龙江交通科技,2017,40(2):91–92,94.
[6]盛文涛,谢锐.连续箱梁挂篮悬浇技术浅析[J].科技与创新,2016(3):157.
[7]晏军.260m长三跨连续箱梁挂篮悬臂浇筑施工工艺[J].建筑工程技术与设计,2018(14):443–444.
[8]余红梅.大跨度连续箱梁桥悬浇变现浇施工工艺及力学特性对比分析[J].建设科技,2016(6):110–111.
[9]吴平琴,潘荣斌.多跨连续箱梁悬臂浇筑合龙段施工关键技术分析[J].交通世界(下旬刊),2017(7):76–77.