摘要
根据收工作在现场踏勘阶段和现场监测阶段的关注重点。其中,现场踏勘分主体工程建设、环保设施及措施落实、重大变动界定等3部分进行了介绍;现场监测分工况监督、焚烧炉技术性能测试、废气排放监测、废水排放监测、在线监测系统比对监测、环境质量监测等6个部分进行了归纳总结,并通过实践总结了该类项目在实际验收监测工作中遇到的问题。
According to the newly issued Technical Specifications for Environmental Protection Acceptance of Construction Projects Completed in China and the acceptance practice of household garbage incineration power generation construction projects, the key points of environmental protection acceptance of such projects in the field survey stage and acceptance monitoring stage are summarized. The key points of field survey are introduced in three parts: main project construction,implementation of environmental protection facilities and measures, and definition of major changes. The key points of acceptance monitoring are summarized in six parts, including working condition monitoring, technical performance testing of incinerator, exhaust emission monitoring, waste water emission monitoring, online monitoring system comparison monitoring, and environmental quality monitoring, and summarized the problems encountered in the acceptance monitoring of such projects through practice
引文
[1]邱立莉,李曼,齐文启等.危险废物集中处置项目竣工环保验收监测中存在的问题及解决对策[J].中国环境监测,2015,31(4):62-67.
[2]齐文启,田志仁,张鹏等.建设项目竣工环保验收监测中影响数据质量因素分析[J].中国环境监测,2014,30(3):23-24.
[3]唐敏,胡志峰,邓劲雷等.水泥工业项目竣工环保验收监测中应关注的问题[J].环境监测管理与技术,2011,23(2):64-67.
[4]生态环境部.建设项目竣工环境保护验收技术指南-污染影响类公告2018(9).
[5]环境保护部.国家质量监督检验检疫总局GB18485-2014生活垃圾焚烧污染控制标准.中国环境科学出版社,2014.
[6]环境保护部.关于印发环评管理中部分行业建设项目重大变动清单的通知(环办〔2015〕52号).
[7]重庆市环境保护局.关于印发重庆市建设项目重大变动界定程序规定的通知(渝环发〔2014〕65号).