以浙能镇海电厂燃煤机组搬迁改造项目中的循环水泵房大型沉井施工为研究对象。在沉井制作前,通过改良地基承载力、加强现场监督管理、建立稳妥的监测系统等预处理施工技术措施,确保了周边环境安全,同时为后续循环水泵房沉井制作及下沉提供了可靠的保证。可供今后类似复杂工况下大型沉井施工参考。
The construction of large caisson of circulating water pump house in the relocation and reconstruction project of coal-fired units of Zheneng Zhenhai Power Plant is taken as the research object.Before the caisson fabrication,the surrounding environment is ensured by improving the foundation bearing capacity,strengthening the on-site supervision and management,and establishing a good monitoring system,and other pretreatment construction technology measures.At the same time,it provides a reliable guarantee for the subsequent caisson fabrication and sinking of circulating pump house.It can provide reference for large caisson construction under similar complex working conditions in the future.
引文
[1]李新明.大型沉井施工技术研究[J].施工技术,2014,43(7):59-62.
[2]张超,崔水忠,林海兵,等.挤密砂桩复合地基承载力的计算研究[J].工程建设,2018(6):38-41;74.
[3]谭仲广.浅谈载荷试验确定复合地基承载力[J].科技致富向导,2011(5):138.
[4]秦振华.软土地基承载力不同确定方法的对比分析[J].山西建筑,2018,44(13):82-83.
[5]韩宝祥,徐红兵.取水泵房沉井施工技术及质量控制措施[J].江苏水利,2015(8):13-16.
[6]李进,欧阳效勇.大型沉井下沉力学性能分析与研究[J].中外公路,2018,38(2):121-126.
[7]陈紫鹃.沉井施工质量控制技术研究分析[J].建筑技术开发,2018,45(1):73-74.
[8]王赟.输电线路电杆的有限元分析及基础的结构优化[D].太原:太原科技大学,2015.
[9]王红霞,黄金枝,苗同臣.大型沉井结构施工力学建模及应用[J].郑州大学学报(工学版),2001,22(2):43-46.
[10]邓友生,万昌中,闫卫玲,等.大型圆形沉井结构应力及其周边沉降计算[J].岩土力学,2015(2):502-508.