摘要
根据某分段现浇连续刚构桥项目,对结构施工全过程的关键性能参数进行监控分析。建立满堂支架施工、预应力张拉、清水混凝土施工和结构合龙等关键节点工程的施工监测与控制方案,并实施一系列监测信息反馈管理,为服务类似工程的施工管控提供了参考。
Based on an in-segment cast-in-place continuous rigid structure bridge project, this paper analyzed the supervision on the key performance parameters during overall process of structural construction. Supervision and control schemes were created for construction of key nodes, such as full scaffold construction, prestress stretching, as-cast finish concrete construction and structure closing, etc., and a series of monitoring information feedback management were carried out, providing references for management and control of similar projects.
引文
[1]项海帆.高等桥梁结构理论[M].北京:人民交通出版社,2001.
[2]Chen,W F,Duan L.Bridge Engineering Handbook:Construction and Maintenance[M].Boca Raton:CRC press,2014.
[3]杜洪,蒋陈.连续刚构桥梁施工控制[J].公路交通技术,2003(2):44–46.
[4]袁帅.分段现浇大跨度预应力混凝土连续梁的探讨[J].中国水运,2009,9(5):206–208.
[5]朱明安,邵斌.桥梁高桥墩(台)分段搭接浇筑施工方法[J].城市道桥与防洪,2013(3):136,142,218.
[6]王晓东,郑德斋,路虹.城市桥梁施工质量控制[J].交通科技与经济,2005(2):23–24,50.
[7]Robertson I N.Prediction of vertical deflections for a long-span prestressed concrete bridge structure[J].Engineering Structures,2005,27(12):1820–1827.
[8]陈洪毅.清水混凝土桥梁工程外观质量控制的研究[D].广州:华南理工大学,2011.
[9]荆友璋.不对称连续刚构合拢段的施工控制[J].北方交通,2012(12):80–83.
[10]赵全胜,齐越,李增壮.桥梁检测和加固技术研究[J].建筑技术,2015,46(S2):392–397.