基于满意度模型的采场结构参数多目标综合优化研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Multi-objective Optimization of Stope Structure Parameters Based on a Satisfaction Model
  • 作者:赵欣
  • 英文作者:ZHAO Xin;School of Resources and Safety Engineering,Central South University;
  • 关键词:采场结构参数 ; 响应面法 ; 采场稳定性 ; 多目标优化 ; 交互作用 ; 数值模拟
  • 英文关键词:stope structure parameters;;response surface method;;stope stability;;multi-objective optimization;;interaction effect;;numerical simulation
  • 中文刊名:KYGC
  • 英文刊名:Mining and Metallurgical Engineering
  • 机构:中南大学资源与安全工程学院;
  • 出版日期:2018-12-15
  • 出版单位:矿冶工程
  • 年:2018
  • 期:v.38;No.184
  • 语种:中文;
  • 页:KYGC201806007
  • 页数:6
  • CN:06
  • ISSN:43-1104/TD
  • 分类号:39-44
摘要
以矿柱宽度、矿房跨度与分段高度3个主要采场结构参数为影响因素,最大压应力、最大拉应力、顶板位移和矿房回采矿量为评价指标,进行了响应面试验设计。采用3DMINE-MIDAS/GTS-FLAC~(3D)联合模型的计算结果,得到响应面结果和评价指标的回归方程,并据此得出单一因素和因素交互作用对评价指标的影响规律;将回归方程和矿房回采矿量引入基于满意度的多目标优化模型,得到最佳采场结构参数。结果表明,所建立评价指标的回归方程相关性很高,能在试验范围内准确地预测结果;评价指标受到单因素和因素间交互作用影响,交互作用中,矿柱宽度与矿房跨度交互作用影响最显著。最佳采场结构参数为:矿柱宽9 m,矿房跨度11 m,分段高度12 m;把该参数应用于招金矿业夏甸金矿,取得了良好的效果。
        Using pillar width,room span and sublevel height as influencing factors,the maximum compressive stress,maximum tensile stress,roof displacement and ore reserves for mining in the room as evaluation indexes,a response surface test was designed for the stope. Then,with the calculation result from a united 3 DMINE-MIDAS/GTS-FLAC3 D model,response surface result and a regression equation of the evaluation index were all obtained. Based on that,the influence rule of single factor and factor's interaction on the evaluation index was deduced. The regression equation and the ore reserves for mining in the room were introduced into the multi-objective optimization model based on satisfaction theory,resulting in optimal parameters for stope structure. Results show that the regression equation of each evaluation index with very high correlation among each other,can accurately predict the evaluation indexes within the range test.The evaluation indexes were influenced not only by single factor,but also by the interaction among three factors. And the interaction of pillar width and room span will bring the greatest impact. Based on the study result,the optimal parameters of stope structure were determined as follows: pillars of 9 m wide,room span of 11 m long and sublevel of 12 m high.And the practice in Xiadian Gold Mine deposit of Zhaojin Mining Co with those optimal parameters showed a good effect.
引文
[1]于世波,解联库,王贺.复杂条件下大规模开采采场结构参数优化研究[J].有色金属工程,2015,5(增刊1):13-16.
    [2]周科平,王星星,高峰.基于强度折减与ANN-GA模型的采场结构参数优化[J].中南大学学报(自然科学版),2013,44(7):2848-2855.
    [3]彭康,李夕兵,彭述权,等.基于响应面法的海下框架式采场结构优化选择[J].中南大学学报(自然科学版),2011,48(8):2417-2423.
    [4]龙科明,王李管.基于ANSYS-R法的采场结构参数优化[J].黄金科学技术,2015,23(6):81-86.
    [5]王新民,李洁慧,张钦礼,等.基于FAHP的采场结构参数优化研究[J].中国矿业大学学报,2010,39(2):163-169.
    [6]曾晟,杨仕教,戴剑勇.岩质边坡可靠性响应面法分析及其在露天矿山的应用[J].有色金属工程,2005,57(2):117-119.
    [7] Wong F S. Slope reliability and response surface method[J]. Journal of Geotechnical Engineering,ASCE,1985,111(1):32-53.
    [8]赵国彦,马举,彭康,等.基于响应面法的高寒矿山充填配比优化[J].北京科技大学学报,2013,35(5):559-565.
    [9]周科平,杜相会.基于3DMINE-MIDAS-FLAC3D耦合的残矿回采稳定性研究[J].中国安全科学学报,2011,21(5):17-22.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号