摘要
对长沙轨道交通4号线黄土岭站深基坑支护结构进行设计,提出基坑邻近边坡、坑底紧邻电力隧道时边坡和电力隧道加固措施,介绍半盖挖法施工流程。分析实测数据表明,支护结构设计和加固措施合理可靠,半盖挖法施工效果良好。
The design of the deep foundation excavation supporting structure of Huangtuling station of Changsha metro line 4 is proposed. The reinforcement measures of the foundation excavation adjacent to the slope and the bottom of the foundation excavation adjacent to the power tunnel are proposed. The construction process of the semi-cover excavation method is introduced. The analysis of the measured data shows that the design of support structures and reinforcement measures are reasonable and reliable,and the semi-cover excavation method has a good effect.
引文
[1]杨华伟.软土地区地铁车站半盖挖法施工技术[J].施工技术,2013,42(7):30-33.
[2]陈艳茹,杨勃.基于半幅铺盖法的地铁站施工中铺盖体系稳定性分析[J].施工技术,2016,45(11):72-75.
[3]中铁第四勘察设计院集团有限公司.长沙市轨道交通4号线一期工程(黄土岭站)设计报告[R],2015.
[4]中铁第四勘察设计院集团有限公司.长沙市轨道交通4号线一期工程地质勘察报告[R],2015.
[5]北京市市政工程设计研究总院有限公司.城市道路工程设计规范(2016版):CJJ37—2012[S].北京:中国建筑工业出版社,2016.
[6]石钰锋,阳军生,白伟,等.紧邻铁路偏压基坑围护结构变形与内力测试分析[J].岩石力学与工程学报,2011,30(4):826-833.
[7]郑刚,王琦,邓旭,等.不同围护结构变形模式对坑外既有隧道变形影响的对比分析[J].岩土工程学报,2015,37(7):1181-1194.
[8]崔高航,刘守花,王兆亮.哈尔滨市某桩锚支护深基坑工程监测[J].建筑结构学报,2016,37(7):144-150.
[9]济南大学,莱西市建筑总公司,山东省工程建设标准造价协会.建筑基坑工程监测技术规范:GB50497—2009[S].北京:中国计划出版社,2009.
[10]北京城建勘测设计研究院有限责任公司.城市轨道交通工程监测技术规范:GB50911—2013[S].北京:中国建筑工业出版社,2013.