塔什店一号矿副立井井壁注浆施工工艺探讨
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Discussion on grouting construction technology of shaft wall of auxiliary shaft of tashdian no.1 mine
  • 作者:张延波 ; 侯江波
  • 英文作者:Zhang Yanbo;Hou Jiangbo;Sichu Mining Engineering Co.,Ltd.,China National Coal Group Co.;
  • 关键词:立井 ; 井壁注浆 ; 施工工艺
  • 英文关键词:shaft;;shaft wall grouting;;The construction technology
  • 中文刊名:JXMT
  • 英文刊名:Jiangxi Coal Science & Technology
  • 机构:河北中煤四处矿山工程有限公司;
  • 出版日期:2019-02-15
  • 出版单位:江西煤炭科技
  • 年:2019
  • 期:No.161
  • 语种:中文;
  • 页:JXMT201901032
  • 页数:2
  • CN:01
  • ISSN:36-1121/TD
  • 分类号:104-105
摘要
以新疆邢美矿业有限公司塔什店一号矿副立井井筒冻结段井壁注浆为例,说明了冻结特殊凿井法双层井壁注浆封堵涌水施工工艺,保障了井筒壁后注浆的顺利实施。
        Taking the grouting of the shaft wall in the freezing section of the shaft shaft of tashdian no.1 mine of xinjiang xingmei mining co.,LTD as an example,this paper illustrates the construction technology of blocking water gushing by the grouting of double-layer shaft wall with the freezing special sinking method,which ensures the smooth implementation of grouting behind the shaft wall.