黄浦江建闸潮波变形数值模拟及机理分析
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Numerical Simulation and Mechanism Analyzing on Tidal Wave Deformation Downstream Sluice in Huangpu River Estuary
  • 作者:宋永港 ; 卢永金 ; 刘新成
  • 英文作者:Song Yonggang;Lu Yongjin;Liu Xincheng;Shanghai Water Engineering Design and Research Institute,Co.,Ltd;Shanghai Engineering Research Center of Reclamation;
  • 关键词:黄浦江 ; 建闸 ; 潮波变形 ; 数值模拟 ; 机理
  • 英文关键词:Huangpu River;;sluice building;;wave deformation;;numerical simulation;;mechanism
  • 中文刊名:SWSH
  • 英文刊名:Shanghai Water
  • 机构:上海市水利工程设计研究院有限公司;上海围海工程技术研究中心;
  • 出版日期:2015-06-15
  • 出版单位:上海水务
  • 年:2015
  • 期:v.31;No.118
  • 语种:中文;
  • 页:SWSH201502003
  • 页数:7
  • CN:02
  • 分类号:8-14
摘要
在受潮汐影响的黄浦江建闸坝会引起闸下河段的潮波变形。利用三维水动力数学模型模拟研究黄浦江建闸后闸下河段潮波变形情况,并进行了机理分析,为闸址选择提供重要参考。研究结果表明,闸下河段潮波变形主要表现为高潮位抬升、低潮位降低、潮差增大、涨潮历时缩短、落潮历时增加,且闸下高水位雍高由闸向口外逐渐减小。潮汐河口的潮波变形的主要原因是河口涨潮量与闸下河段水体容量之间的不匹配引起的潮汐动能与势能之间的转换,当河道容量小于涨潮量时,潮波变形以潮波高频振荡为主,且随离河口距离增大震荡频率减小、水位雍高增大:当河道容量与涨潮量接近时,水位雍高最大;当河道容量大于涨潮量时,潮波变形仍以水位雍高为主,随闸位上移水位雍高逐渐减小。
        Building sluice in Huangpu River which is controlled by tide will cause tide wave deformation downstream.3-D dynamic numerical model is used to simulate the tidal wave deformation downstream the sluice in this paper.The result shows that,the deformation performs mainly as high tidal lever upper,low tidal level lower,tidal range larger,flood tidal duration shorter and ebb tidal duration longer.The surge downstream sluice differs along the river.Usually,the surge increases from the estuary to sluice.The tidal deformation mainly depends on the combination of channel capacity downstream the sluice and flood tidal volume,the tidal deformation performs as high frequency oscillation with the frequency decreasing and the surge increasing as sluice moves upstream.When the channel capacity is close to the volume,the tidal deformation performs mainly as tidal level raising with the biggest surge all of the situation.When the channel capacity is bigger than the volume,tidal level surging is the main performance with the surge decreasing as sluice moves upstream.
引文
[1]卢永金.上海市防御台风战略对策探讨[J].城市道桥与防洪,2007(4):29~33.
    [2]上海市防汛信息中心课题组.国内外沿海河口大城市防洪防潮标准及对策措施的调研[R].上海:上海市防汛信息中心,2000.
    [3]陈美发.黄浦江河口建闸工程规划研究[J].水利水电科技进展,2001,21(5):12~13.
    [4]黄浦江潮位分析课题组.黄浦江潮位分析(修编)[R].上海:上海市水文总站,2004.
    [5]王向明,张新周,窦希萍,赵晓冬,朱明成,李肖肖。建闸河口闸下潮波变形数值模拟研究[J].水运工程,2012(9):18~23.
    [6]徐雪松,窦希萍,赵晓冬,王向明,张新周。建闸河口潮波变形概化模型研究[J].水运工程,2011(6):6~10.
    [7]胡欣,徐贵泉,黄士力等。黄浦江河口建闸工程选址研究报告[R].上海:上海市水务规划设计研究院,2005.
    [8]崔冬,赵庚润,卢永金.黄浦江河口建闸挡潮效果初步分析[J].水利水电科技进展.2012.32(1):54~57.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700