管棚联合钢拱架穿越煤矿斜井塌方段施工
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Construction with Pipe Sheds and Steel Arch Supports Pass through Collapse Section of Inclined Shaft
  • 作者:黄宝龙
  • 英文作者:HUANG Baolong;Mine Construction Institute,Tiandi Science & Technology Co.,Ltd.;
  • 关键词:管棚 ; 钢拱架 ; 斜井 ; 塌方
  • 英文关键词:pipe shed;;steel arch support;;inclined shaft;;collapse
  • 中文刊名:JJJS
  • 英文刊名:Mine Construction Technology
  • 机构:天地科技建井研究院;
  • 出版日期:2019-02-25
  • 出版单位:建井技术
  • 年:2019
  • 期:v.40;No.214
  • 语种:中文;
  • 页:JJJS201901006
  • 页数:4
  • CN:01
  • ISSN:11-2456/TD
  • 分类号:24-27
摘要
为了顺利通过郝家梁煤矿副斜井塌方段,借鉴隧道塌方治理经验,制定了管棚联合钢拱架穿越塌方段技术方案,并制定了有针对性的安全技术措施。方案实施后,安全顺利通过塌方段,处理效果达到了工程质量要求,对类似黄土斜井塌方治理有借鉴意义。
        In order to successfully pass through the collapse section of the auxiliary inclined shaft in Haojialiang Coal Mine,taking example by the control experiences for the tunnel collapses,a technical plan with the pipe sheds and steel arch supports was set up to pass through the collapse section of the inclined shaft,and the targeted safety technical measures were set up.After the technical plan implemented,the construction safely and successfully passed through the collapse section,and the control effect reached the requirements of the engineering quality.It can provide some references for controlling the similar collapse of the inclined shaft in loess area.
引文
[1]黄宝龙.大断面黄土斜井塌方处理工程实践[J].黄金,2015,36(11):37-40.
    [2]李宁,朱才辉.黄土隧道设计与施工中的几个问题[J].地下空间与工程学报,2016,12(6):1598-1607.
    [3]齐甦,王立英,崔小鹏,等.兰渝铁路清水隧道塌方治理结果的分析[J].现代隧道技术,2014,51(2):172-177.
    [4]饶军应,傅鹤林,黎明,等.白山隧道塌方处治技术及其监测结果分析[J].现代隧道技术,2014,51(2):157-166.
    [5]王运金.九岭山隧道塌方治理及塌方治理效果检测[J].现代隧道技术,2008,45(6):82-87.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700