基于BIM和PDCA的施工进度管理研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Research on Construction Schedule Management Based on BIM and PDCA
  • 作者:陈礼松 ; 汪夏明 ; 秦康 ; 唐光文 ; 陆征宇
  • 英文作者:CHEN Lisong;WANG Xiaming;QIN Kang;TANG Guangwen;LU Zhengyu;Guangxi Construction Engineering Group Co.,Ltd.;Department of Housing and Urban-Rural Development of Guangxi Zhuang Autonomous Region;College of Civil Engineering and Architature,Guangxi University;Guangxi Construction Engineering Railway Prefabricated Construction Industry Co.,Ltd.;Guangxi Construction Engineering Group No.5 Construction Engineering Co.,Ltd.;
  • 关键词:建筑信息模型 ; PDCA ; 进度管理 ; 可视化 ; 信息管理平台
  • 英文关键词:building information modeling(BIM);;PDCA;;schedule control;;visualization;;information management platform
  • 中文刊名:SGJS
  • 英文刊名:Construction Technology
  • 机构:广西建工集团有限责任公司;广西壮族自治区住房和城乡建设厅;广西大学土木建筑工程学院;广西建工轨道装配式建筑产业有限公司;广西建工集团第五建筑工程有限责任公司;
  • 出版日期:2019-04-10
  • 出版单位:施工技术
  • 年:2019
  • 期:v.48;No.530
  • 基金:广西科技计划(桂科AB16380296)
  • 语种:中文;
  • 页:SGJS201907038
  • 页数:7
  • CN:07
  • ISSN:11-2831/TU
  • 分类号:136-142
摘要
由于建筑业规模的持续扩大,项目超工期现象的普遍存在,现有的进度管理方法存在一定的局限性,以及建设项目迈向复杂化、大型化的发展趋势,这些行业现状对进度管理提出了更高的要求,迫切需要一种更有效的进度管理方法来改善这些行业现状。因此,对施工进度管理进行研究具有重要的现实意义。BIM技术的高速发展以及PDCA循环原理的延伸应用,为建立科学有效的进度管理方法提供了新的思路。在传统进度管理方法的基础上,集成BIM技术和PDCA循环原理的优势,提出了基于BIM和PDCA的进度管理方法,实现了进度管理的事前优化、事中控制以及事后巩固。
        Due to the continuous expansion of the construction industry,the widespread phenomenon of the project overschedule,the existing schedule management methods have some limitations,and the development trend of the construction project is becoming more complex and large-scale. The current situation of these industries has put forward higher requirements for schedule management,and a more effective schedule management method is urgently needed to improve the current situation of these industries. Therefore,the study of construction schedule management has important practical significance.Therefore,the research on construction schedule management has important practical significance,such as the rapid development of. bim technology and the extension and application of pdca cycle principle,which provides a new idea for the establishment of scientific and effective schedule management method.Based on the traditional schedule management method,this paper integrates the advantages of bim technology and pdca cycle principle,and puts forward a schedule management method based on bim and pdca,which realizes the prior optimization, in-process control and post-consolidation of schedule management.
引文
[1]赵惠珍,倪稞,郭巧洪,等. 2016年建筑业发展统计分析[J].工程管理学报,2017,31(3):1-13.
    [2]赵峰,王要武,金玲,等. 2017年建筑业发展统计分析[J].工程管理学报,2018,32(3):1-6.
    [3]董娜,张宁,赵雪媛,等.基于BIM与RFID的工业化建筑构件进度管理研究[J].施工技术,2018,47(10):5-10.
    [4]王广斌,胡雨晴,戚淑芳.基于SNA的工程项目进度管理研究———以上海D项目为例[J].工程管理学报,2016,30(1):103-108.
    [5]王继华,严莉,王一凡,等.项目群进度管理的研究与实践[J].工程管理学报,2015,29(3):126-130.
    [6]周永川,于立军,彭建伟.基于BIM的港珠澳大桥交通工程施工进度管理系统应用研究[J].公路交通科技,2017,34(s1):92-96.
    [7]谢勇,谢涛,钱由胜.BIM+项目管理在工程中的应用研究[J].施工技术,2018,47(14):154-157.
    [8]王明明,陈代果,姚勇,等.基于BIM的土石坝4D模型在施工进度管理中的应用框架[J].施工技术,2018,47(16):132-135+,165.
    [9]苏亚武,杨红岩,齐磊,等.基于BIM的4D计划管理在超高层项目中的应用[J].施工技术,2017,46(23):7-9.
    [10]王顺泽.BIM技术在核电施工进度计划中的应用[J].施工技术,2017,46(6):50-52,55.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700