摘要
为分析沅水上游水电站投运后,对五强溪水电站发电效益的影响,首先根据流域实际来水还原计算五强溪的天然来水过程,利用还原计算的天然来水,按五强溪实际运行控制水位计算发电量,五强溪实际年均发电量比还原计算年均发电量增加3.297亿k W·h。通过梯级水库的调节、补偿作用,可显著增加五强溪及梯级水电站的发电效益。
In order to analyze the impact of the operation of Yuan River upstream cascade hydropower stationon the power generation benefit of the Wuqiangxi Hydropower Station,firstly,the natural incoming water process of Wuqiangxi Reservoir is calculated according to the actual water inflow process of the river basin. Using the calculated natural incoming water,the generated energy of Wuqiangxi Reservoir controlled by the actual operating water level is calculated. The calculated average annual generated energy is 329.7 million k W·h less than the actual generated energy.The power generation benefits of Wuqiangxi Hydropower Station and cascade hydropower stations can be significantly increased through the regulation and compensation of cascade reservoirs.
引文
[1]湛洋,黄炜斌,陈仕军,等.基于POA优化的双江口水电站对下游梯级发电补偿效益研究[J].水电能源科学,2015(9):65-68.
[2]黄草,王忠静,李书飞,等.长江上游水库群多目标优化调度模型及应用研究I:模型原理及求解[J].水利学报,2014,45(9):1009-1018.
[3]李克飞,武见,董滇红,等.基于DPSA的水库优化调度方案研究[J].人民黄河,2015,37(10):128-130.
[4]马立亚,雷晓辉,蒋云钟,等.基于DPSA的梯级水库群优化调度[J].中国水利水电科学研究院学报,2012,10(2):140-145.
[5]李义,李承军,周建中.POA-DPSA混合算法在短期优化调度中的应用[J].水电能源科学,2004,22(1):37-39.