摘要
结合某项目装配式建筑现场吊装施工,针对选择的吊装方案,对构件吊装顺序、流程等施工工艺进行分析,并对钢扁担进行受力计算,确保了预制构件吊装的安全,保证了施工质量,可为类似工程提供参考。
Based on the hoisting of assembly building of a certain project,the order of component hoisting,component hoisting process and other hoisting construction processes were analyzed according to the chosen lifting plan. And the steel pole was also subjected to force calculation to ensure the hoisting construction safety and construction quality of prefabricated components,which might prefer references to similar projects.
引文
[1]于慧.高层装配式建筑墙板吊装的应用研究[D].淮南:安徽理工大学,2017.
[2]梁燕.装配式混凝土构件吊装工具设计及配件选用[J].混凝土世界,2017(5):74-76.
[3]何旭辉,连彬.浅谈装配式钢筋混凝土结构吊装施工质量控制[J].低碳世界,2017(6):151-152.
[4]周光毅,宫立宝,王佳斌,等.装配式混凝土结构停车楼吊装施工技术[J].施工技术,2016,45(4):31-34.
[5]尹锦明,姜毅,韩光义.装配式水泥混凝土路面板块吊装应力分析[J].施工技术,2015,44(S1):393-396.
[6]向欢欢.锦丰新城保障性住房项目进入装配式剪力墙结构吊装施工[J].安装,2016(4):65.