成贵铁路贵州鸭池河特大桥主桥拱肋架设施工技术
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Construction Techniques for Erection of Arch Rib of Main Bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway
  • 作者:王亚维
  • 英文作者:WANG Ya-wei;The 5th Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group;
  • 关键词:铁路桥 ; 拱桥 ; 钢桁-混凝土结合拱 ; 拱肋 ; 节段拼装 ; 斜拉扣挂法 ; 外包混凝土 ; 桥梁施工
  • 英文关键词:railway bridge;;arch bridge;;steel truss and concrete composite arch;;arch rib;;segment assembling;;fastening stay method;;encasing concrete;;bridge construction
  • 中文刊名:QLJS
  • 英文刊名:Bridge Construction
  • 机构:中铁大桥局集团第五工程有限公司;
  • 出版日期:2017-02-28
  • 出版单位:桥梁建设
  • 年:2017
  • 期:v.47;No.242
  • 语种:中文;
  • 页:QLJS201701019
  • 页数:5
  • CN:01
  • ISSN:42-1191/U
  • 分类号:107-111
摘要
成贵铁路贵州鸭池河特大桥主桥为主跨436m的中承式钢桁-混凝土结合拱桥,提篮式拱肋与铅垂面夹角为4.62°。针对该桥结构特点和桥址处地质条件,主拱肋采用分节段工厂制造,将单元件运至岸边预拼场内,在预拼场内组拼成节段,利用大型缆索吊机,采用扣挂法悬臂拼装。其中,主桥拱肋首节段利用塔吊进行散件拼装,散拼顺序为先下后上、先内后外;拱肋标准节段在弧形胎架上进行精确组拼,采用吊重480t、跨度460m的大型缆索吊机吊装,并利用斜拉扣挂系统进行辅助安装;合龙段采用连续观测、精确配切等技术进行合龙施工;拱肋外包混凝土采用"吊挂支架法"施工。该桥已顺利合龙,且合龙精度在±2mm内,满足设计要求。
        The main bridge of Guizhou Yachi River Bridge on Chengdu-Guiyang Railway is a half-through steel truss and concrete composite arch bridge with a main span of 436 m.The main arch rib of the bridge is the basket-handle arch rib and the angle included between the arch rib and the vertical plane is 4.62°.In the light of the structural characteristics of the bridge and the geologic conditions at the bridge site,the arch rib was firstly fabricated in smaller segments in the workshop,the segments of the arch rib were then transported to the assembling yard at the river bank,were assembled into the larger segments and were finally cantileveredly erected at the bridge site,using the large cable crane aided by the fastening stay method.In the assembling,the first segment of the arch rib was assembled piece by piece,using the tower crane and the sequence was that the upper parts of the segment were assembled first and the lower parts were then,the inner sides were assembled first and the outer sides were then.The standard segments of the arch rib were precisely assembled on the arc shape jigs and were erected,using the cable carne having the lifting capacity of 480 tand span length of 460 m with the aid of the fastening stay system.The closure segment was erected by the techniques of the continuous observation and precise match cutting and the construction of encasing the arch rib with the concrete was carried out,using the hanging scaffolding method.Presently,the bridge has been smoothly closed,the closure precision is within ±2mm and satisfies the design requirements.
引文
[1]中铁大桥勘测设计院集团有限公司.贵州鸭池河特大桥施工图设计第一册[Z].武汉:2013.(China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.Construction Drawing Design of Yachi River Bridge in Guizhou,Volume I[Z].Wuhan:2103.in Chinese)
    [2]中铁大桥局集团有限公司设计分公司.成贵客运专线鸭池河特大桥工程缆索系统施工设计图[Z].武汉:2014.(Design Company,China Railway Major Bridge Engineering Group Co.,Ltd.Construction Design Drawings of Cable Systems of Yachi River Bridge on Chengdu-Guiyang Passenger Dedicated Railway[Z].Wuhan:2104.in Chinese)
    [3]MBEC 1005-2014,钢桁梁(拱)架设施工[S].(MBEC 1005-2014,Construction of Erection of Steel Truss Girders(Arches)[S].)
    [4]王俊,向中富.特大跨钢桁拱桥建造技术[M].北京:人民交通出版社,2014.(WANG Jun,XIANG Zhong-fu.Construction Technology of Large Span Steel Truss Arch Bridge[M].Beijing:China Communications Press,2014.in Chinese)
    [5]张春新.西江特大桥钢箱提篮拱架设施工技术[J].桥梁建设,2015,45(5):7-12.(ZHANG Chun-xin.Construction Techniques for Erection of Steel Box Basket Handle Arch of Xijiang River Bridge[J].Bridge Construction,2015,45(5):7-12.in Chinese)
    [6]汪芳进.新建南广铁路西江特大桥钢箱提篮拱架设方案比选[J].桥梁建设,2013,43(6):117-121.(WANG Fang-jin.Comparison and Selection of Erection Scheme for Steel Box Basket Handle Arch of Xijiang River Bridge on Newly-Built Nanning-Guangzhou Railway[J].Bridge Construction,2013,43(6):117-121.in Chinese)
    [7]曹国银,陈鸣.宁波明州大桥400t缆索吊装系统架设技术[J].桥梁建设,2011(5):74-80.(CAO Guo-yin,CHEN Ming.Techniques for Installation of 400tCapacity Cable Hoisting System of Mingzhou Bridge in Ningbo[J].Bridge Construction,2011(5):74-80.in Chinese)
    [8]郭吉平.北盘江大桥缆吊系统及钢桁梁安装关键技术[J].世界桥梁,2011(6):22-25.(GUO Ji-ping.Key Techniques for Installation of Cable Hoisting System and Steel Truss Girder of Beipan River Bridge[J].World Bridges,2011(6):22-25.in Chinese)
    [9]陈强,向华伟,彭学理,等.大跨度钢桁拱桥架设过程控制技术[J].公路交通科技,2014,31(5):78-85.(CHEN Qiang,XIANG Hua-wei,PENG Xue-li,et al.Control Techniques of Erection Process of LongSpan Steel Truss Arch Bridge[J].Journal of Highway and Transportation Research and Development,2014,31(5):78-85.in Chinese)
    [10]米孝生,胡智敏,陈伟.大跨径钢箱拱肋整体提升关键技术研究[J].公路交通科技,2015,32(7):92-97.(MI Xiao-sheng,HU Zhi-Min,CHEN Wei.Research on Key Technology of Integral Lifting of Long-Span Steel Box Arch Rib[J].Journal of Highway and Transportation Research and Development,2015,32(7):92-97.in Chinese)