摘要
比较集装箱船货舱区总段不同的总组方式,分析各种方式的技术特点。以2 200TEU集装箱船货舱区为例,阐述以环段总组的作业方法和关键技术,指明该法对生产设计、建造方法和精度管理方式的影响和要求,为集装箱船建造技术和工艺优化开拓了新的视野。
Comparing the different pre-erection methods of annular subsections applying to cargo hold of container vessel,the technical characteristics of the various methods are analyzed.Based on the cargo hold of a 2 200 TEU container vessel,the key points of technology and the operation method of the pre-erection methods are explained.And the influences and requirements of the method on production design,construction method and precision management are obtained,which opens up a new direction for the construction technology and process optimization of container vessels.
引文
[1]刘建峰,张海甬,孙建志,等.18 000TEU集装箱船关键建造技术[J].船舶与海洋工程,2017(1):65-71.
[2]顾奇恩.超大型集装箱船的船体建造工艺[J].工程建设与设计,2016(7X):128.
[3]余勇华,陈金炉,杨辉.10 000TEU超大型集装箱船的建造工法设计[J].江苏船舶,2015,32(4):34-35.
[4]林龙海.船体分段总组与合龙精度管理研究及应用[D].大连:大连理工大学,2015.
[5]刘杰.造船精度控制及管理相关技术工艺探讨[J].华东科技:学术版,2014(3):6-7.
[6]温永生.船体总组与合龙精度控制研究[D].哈尔滨:哈尔滨工程大学,2011.
[7]王孝海.船体分段建造的精度控制研究[D].哈尔滨:哈尔滨工程大学,2011.
[8]张立兵.大型集装箱船货舱建造精度质量控制技术研究[D].哈尔滨:哈尔滨工程大学,2007.
[9]蔡鹏天,杨立志,张晨俊.45 000t集装箱滚装船超高导轨架精度控制[J].船舶与海洋工程,2017,33(2):57-61.
[10]刘保华,郭俊林,吕紫维,等.超大型集装箱船导轨架分段阶段安装技术研究[J].造船技术,2015(5):46-51.
[11]周晔,胡芳,赖芳,等.万箱集装箱船货舱导轨分段预装精度控制研究[J].江苏船舶,2014,31(6):3841.