摘要
从工程实际情况出发,结合超高层核心筒结构施工特点,创新地提出核心筒竖向结构采用爬模+铝合金模板体系,同时水平结构采用铝合金模板快拆体系,并与竖向结构同步施工。通过理论分析及深化设计,解决方案设计阶段施工可行性的问题。在工程实践中,核心筒爬模与铝合金模板一体化施工技术的应用取得良好的工期、质量、安全、经济与社会效益。
Based on the actual engineering situation and the construction characteristics of core tube structure of super high-rise,the vertical structure of core tube is innovatively proposed to adopt climbing formwork+ aluminium alloy formwork system,while the horizontal structure adopts aluminium alloy formwork fast demolition system,and constructs synchronously with the vertical structure. Through theoretical analysis and detailed depth design,the problems of construction feasibility in the design stage are solved. In engineering practice,the application of integrated construction technology of core tube climbing formwork and aluminium formwork achieves good time limit,quality,safety,economic and social benefits.
引文
[1]江苏江都建设工程有限公司.液压爬升模板工程技术规程:JGJ195—2010[S].北京:中国建筑工业出版社,2010.
[2]中国建筑科学研究院.混凝土结构设计规范:GB50010—2010(2015年版)[S].北京:中国建筑工业出版社,2016.
[3]同济大学.铝合金结构设计规范:GB50429—2007[S].北京:中国计划出版社,2008.
[4]沈阳建筑大学.建筑施工模板安全技术规范:JGJ162—2008[S].北京:中国建筑工业出版社,2010.
[5]中国建筑股份有限公司.建筑施工手册[M].北京:中国建筑工业出版社,2012.
[6]江正荣.建筑施工计算手册[M].北京:中国建筑工业出版社,2013.