以上海世博会B片区改造工程为例,在深基坑开挖过程中对邻近的地下综合管廊保护措施进行了研究,并介绍了基坑不同施工阶段时相应的地下综合管廊保护措施。实测监测数据表明,该保护措施效果显著,整个施工过程中管廊变形量均满足市政部门监管的严格要求。
Taking the renovation project of Shanghai World Expo B-Zone as an example,in the excavation process of deep foundation pit,the protection measures of adjacent underground integrated pipe gallery are studied,and the corresponding underground integrated pipe gallery protection measures for different construction stages are introduced.The actual monitoring data indicate that the protection measures are effective,and the deformation of the pipe gallery in the whole construction process meets the strict requirements of the municipal department's supervision.
引文
[1]王琼.地下联络通道零距离下穿共同沟关键施工技术[J].建筑施工,2014,36(7):866-868.
[2]凌涛,李书信,钮峰.邻近浅埋地铁及市政共同沟的深45 m地下连续墙施工技术[J].建筑施工,2017,39(6):752-755.
[3]汪春生.新建地铁隧道下穿既有地铁施工技术[J].都市快轨交通,2010(1):82-84,88.
[4]赵克生.浅埋暗挖法地铁区间隧道零距离下穿既有线施工技术[J].铁道标准设计,2008(12):72-76.
[5]彭真.60 m超深地下连续墙施工技术[J].建筑施工,2012,34(7):635-636.
[6]吴卫,陈建华,王成云.暗挖换乘通道零距离穿越既有城铁车站施工技术[J].市政技术,2009(S2):259-262.
[7]王扬.地下联络通道冻结法设计施工[J].交通世界(工程.技术),2015(3):120-121.