洪屏抽蓄电站推力瓦瓦温过高原因分析与处理
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Analysis and Treatment on High Temperature of Thrust Bearing Pads for Hongping Storage Hydropower Plant
  • 作者:唐拥军 ; 周喜军 ; 邓磊 ; 吕滔
  • 英文作者:TANG Yong-jun;ZHOU Xi-jun;DENG Lei;LV Tao;Technology Center of State Grid Xinyuan Company LTD.;
  • 关键词:抽水蓄能机组 ; 推力瓦 ; 温度 ; 水推力 ; 油膜厚度
  • 英文关键词:pump storage unit;;thrust bearing pad;;temperature;;hydraulic thrust;;oil film thickness
  • 中文刊名:SDNY
  • 英文刊名:Water Resources and Power
  • 机构:国网新源控股有限公司技术中心;
  • 出版日期:2018-11-25
  • 出版单位:水电能源科学
  • 年:2018
  • 期:v.36;No.219
  • 语种:中文;
  • 页:SDNY201811039
  • 页数:4
  • CN:11
  • ISSN:42-1231/TK
  • 分类号:163-166
摘要
江西洪屏电站装机4台300MW的抽水蓄能机组在启动调试期间均出现了推力瓦瓦温过高的现象,这使得推力瓦存在烧瓦的风险,从而威胁机组的安全稳定运行。为此,从设计、制造与安装三方面分析了推力瓦瓦温过高的原因,发现推力轴承结构设计存在不足,最终通过增大推力瓦外径、换用金属弹簧簇支撑和优化推力瓦进油边等措施使得推力瓦瓦温大幅降低,且满足合同保证值要求,成功解决了洪屏电站机组推力瓦瓦温过高的问题。
        Jiangxi Hongping hydropower plant was equipped with four pump turbine-generator motor units.The capacity of each unit was 300 MW.It was found that the temperature of thrust bearing pads were excessive high in each unit's start-up test period,which may cause damage to thrust bearing pads,so it was a big menace to the safety running of unit.Therefore,a detail analysis was conducted from three aspects of design,manufacture and installation,and it was found that the structure design of thrust bearing was imperfect.Finally,the increase of outer bearing diameter,using steel spring columns for mattress support and optimization of pad chamfers were adopted as the main changes of the thrust bearing.As a result,the temperature of thrust bearing pads decreased significantly and satisfied the requirement of guarantee value of contract.The problem of excessive high temperature of thrust bearing pads was successfully solved.
引文
[1]肖先照.响水涧推力瓦温偏高原因分析及处理[J].上海大中型电机,2015(1):53-55.
    [2]郭志林.立式机组推力轴承瓦温过高及磨损事故的分析与对策[J].科技风,2013(14):51-51.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700