实现工程造价控制目标的全方位管理方法
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:All-round Management Strategy to Promote Lean Management and Control
  • 作者:齐咏梅
  • 英文作者:QI Yongmei;Laiwu Branch of Shandong Iron and Steel Co., Ltd.;
  • 关键词:工程造价 ; 控制目标 ; 全方位管理 ; 成本费用
  • 英文关键词:project cost;;control objective;;all-round management;;cost
  • 中文刊名:SDYJ
  • 英文刊名:Shandong Metallurgy
  • 机构:山钢股份莱芜分公司;
  • 出版日期:2019-04-20
  • 出版单位:山东冶金
  • 年:2019
  • 期:v.41;No.214
  • 语种:中文;
  • 页:SDYJ201902026
  • 页数:2
  • CN:02
  • ISSN:37-1203/TF
  • 分类号:69-70
摘要
对拟建工程编制施工图预算,把造价控制在计划范围内,宏观控制工程造价,严格过程管理,全过程、全面的进行监控,在投资决策阶段、设计阶段、建设实施阶段层层把关,对工程造价全方位管理,多维合作,实现降低工程造价的目标。
        To achieve the goal of reducing the project cost through multi-dimensional cooperation, the construction drawing budget was prepared for the proposed project. The cost was controlled within the planning scope and the project cost was controlled macroscopically. The process management was strictly controlled, the whole process was monitored comprehensively, the construction cost in the investment decision-making stage, the design stage, and the construction implementation stage were controlled at all levels, the project cost was managed in an all-round way.
引文
[1]寇万超.建筑工程造价预结算审核中出现的问题及应对措施[J].价值工程,2018(26):7-8.
    [2]史国桢.工程造价预结算审核常见问题及应对措施[J].山西建筑,2017(21):2-3.
    [3]孔基华.探究市政工程道路造价的预结算审核[J].中国新技术新产品,2016(18):9-11.
    [4]胡子茂.浅谈施工企业对预结算的管理[J].智能城市,2017(11):12-14.
    [5]谢婷婷.建筑工程中的预结算审核及常见问题分析[J].建材与装饰,2018(6):20-21.
    [6]陈红玉.建筑项目工程造价预结算审核要点探讨[J].绿色环保建材,2018(3):18-20.
    [7]沈春波.建筑安装工程造价预结算审核问题及对策[J].城市建设理论研究(电子版),2018(2):30-31.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700