崩塌灾害智能化监测预警的终端前置模式及其应用
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:“Front”intelligent monitoring and warning terminal of collapse disaster and its application
  • 作者:熊清远 ; 杨宁 ; 郑勇 ; 周勇
  • 英文作者:XIONG Qingyuan;YANG Ning;ZHENG Yong;ZHOU Yong;Sichuan Yuande Security Detection Equipment Co.LTD;Chongqing Geographic Information Center;Sichuan Geological Environment Monitoring Station;Southwest research and design institute of nuclear industry;
  • 关键词:地质灾害 ; 监测预警 ; 终端“前置”
  • 英文关键词:geological disaster;;monitoring and early warning;;terminal "front"
  • 中文刊名:ZGDH
  • 英文刊名:The Chinese Journal of Geological Hazard and Control
  • 机构:四川远德安防检测设备有限公司;重庆市地理信息中心;四川省地质环境监测总站;核工业西南勘察设计研究院;
  • 出版日期:2018-02-15
  • 出版单位:中国地质灾害与防治学报
  • 年:2018
  • 期:v.29;No.113
  • 语种:中文;
  • 页:ZGDH201801019
  • 页数:5
  • CN:01
  • ISSN:11-2852/P
  • 分类号:131-135
摘要
大多数地质灾害监测预警系统的工作模式都是"前端"采集地灾异常信息,再通过网络将数据发回后台的"终端"进行分析处理。联系系统"前端"与"终端"的网络系统出现问题时,其功能和作用必将受到影响。将系统终端前置并创建不完全依赖通讯网络的新工作模式,是提高地灾监测预警系统功效的有效途径。四川省荣县"9·1"中型地质灾害中,因前置终端对地灾判断准确可靠、预警及时有效,使崩塌危害区域内的180多人成功避险,堪称崩塌灾害智能化监测预警终端"前置"的一个成功案例。
        Most of the geological disaster monitoring and early warning system work mode is "front-end "collection of disaster change information,and then through the network to back the data back to the background control "terminal"for analysis and processing. When there is a problem with the network system of "front end"and "terminal",its functions and actions are bound to be affected. Placing the system terminal at the monitoring site and create a new working model that doesn't completely rely on communication networks is an effective way to improve the effect of geological disaster monitoring and early warning. In the "9·1"middle geological disaster in Rong County,Sichuan Province,because of the terminal terminal,the judgment of ground disaster was accurate and reliable,the warning was in time and effective,more than 180 people in the area of collapse hazard have been successfully safe. It was a successful case of the "front " intelligent monitoring and warning terminal of collapse disaster.
引文
[1]陈祥军,王景春.地质灾害防治[M].北京:中国建筑工业出版社,2012.CHEN Xiangjun,WANG Jingchun.Geological hazard control[M].Beijing:China Construction Industry Press,2012.
    [2]刘传正.重大地质灾害防治理论与实践[M].北京:科学出版社,2009.LIU Chuanzheng.Theory and practice of prevention and control of major geological disasters[M].Beijing:Science Press,2009.
    [3]李聪,朱杰兵,王斌,等.滑坡不同变形阶段演化规律与变形速率预警判据研究[J].岩石力学与工程学报,2016,7(10):43-46.LI Cong,ZHU Jiebing,WANG Bin,et al.Study on evolution law and early warning criterion of deformation rate in different deformation stages of landslide[J].Journal of Rock Mechanics and Engineering,2016,7(10):43-46.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700