摘要
黄金坪水电站处于大渡河上游河段,上接长河坝梯级电站,下游为泸定电站。介绍了导流洞明渠开挖中高压旋喷防渗墙的设计、施工工艺流程、施工工艺参数、施工方法、检测方法、结论,以为类似工程提供借鉴。
The Jinping Hydropower Station is located in the upper reaches of the Dadu River, connected to the Changhe Dam cascade power station and downstream to the Luding Power Station. The design, construction process, construction process parameters,construction methods, testing methods and conclusions of the high-pressure jet-jet anti-seepage wall in the diversion tunnel open channel are introduced to provide reference for similar projects.