马来西亚某煤堆场项目的复杂工况对于采用真空预压法地基处理具有很大的挑战。针对工程中存在的复杂工程问题进行了研究,为此提出了各项相关技术措施,并通过对现场监测和自检资料的分析验证了该技术措施的有效性,同时对加固效果也进行了研究,得到了一些经验数据。
The complex working conditions of a coal yard project in Malaysia results great challenges for the ground treatment by vacuum preloading. In order to solve the complex engineering problems,various technical measures have been proposed for this purpose,and the effectiveness of the technical measures was verified by the analysis of on-site monitoring and self-test data. At the same time,the reinforcement effect was also studied and some empirical data was obtained.