针对典型大采高综采工作面的端面煤岩块体控制难题,首先从覆岩活动特点、原生裂隙及次生裂隙发展规律、端面关键块体的受力分析入手,研究了端面煤岩块体冒落的机理,进而制定了端面关键块体的平衡控制措施,并对现场管理提出合理化建议,保障了2502大采高综采工作面的高产高效生产。
Aiming at the difficult problem of controlling end face coal and rock block in typical fully mechanized mining face with large mining height,the mechanism of end face coal and rock block caving is studied from the characteristics of overburden activity,the development law of primary and secondary cracks,and the stress analysis of key end face block,and then the balanced control measures of key block at end face are formulated,and reasonable suggestions are put forward for site management,which ensures the high-yield and high-efficiency production of 2502 large mining areas in fully mechanized mining face.
引文
[1]朱涛.软煤层大采高综采采场围岩控制理论及技术研究[D].太原:太原理工大学,2010.
[2]梁运培,李波,袁永,等.大采高综采采场关键层运动型式及对工作面矿压的影响[J].煤炭学报,2017,42(6):1 380-1 391.
[3]孙庆先,牟义,杨新亮.红柳煤矿大采高综采覆岩“两带”高度的综合探测[J].煤炭学报,2013,38(Supple2):283-286.
[4]李恒,康天合,李晓坡,等.大采高综采支架初撑力对煤壁稳定性的影响研究[J].煤炭科学技术,2016,44(9):67-71,92.
[5]刘琳.大采高综放开采端面煤岩体稳定性及其控制研究[J].煤,2016,25(9):47-48.